My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-05-21 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-05-21 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 3:10:38 PM
Creation date
5/17/2018 5:10:42 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/21/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
725
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
353 Main Street Apartments <br />Redwood City, California <br />May 1, 2018 <br />(Originol Report Dated November 18,2076) <br />Be coarse grained and have a plasticity index of less than L5 and/or an <br />expansion index less than 20; <br />Be free of organics, debris or other deleterious material; <br />Have a maximum rock size of 3 inches; and <br />Contain sufficient clay binder to allow for stable foundation and utility <br />trench excavations. <br />Proposed imported soils should be submitted at least three days before being transported <br />to the site for evaluation by the geotechnical engineer. During importation to the site the <br />material should be further reviewed on an intermittent basis. <br />Foundations <br />L. The proposed apartment building may be supported on a deep foundation system <br />consisting of drilled displacement piles (DDP) connected with a structural floor slab. Local <br />specialty contractors that can install the Drill Displacement Piles (DDP) are Farrell Design- <br />Build, lnc., Malcolm Drilling, and Berkel & Company Contractors. <br />Exterior Flatwork <br />L. Exterior flatwork should have a minimum thickness of 4 full inches and should be <br />reinforced as directed by the architect/engineer. <br />Exterior flatwork that will not experience vehicular should be cast over a minimum of 4 <br />inches of compacted aggregate base. However, use of a greater thickness of aggregate <br />base would enhance the flat work performance. The edge of the flat work should be <br />thickened to penetrate at least 3 inches into the subgrade soil if only 4 inches of non- <br />expansion material is utilized. Exterior flatwork that will experience vehicular traffic <br />should be underlain by at least 6 inch layer of compacted aggregate. <br />Assuming that movement (i.e., L/4-inch or more) of exterior flatwork beyond the <br />structure is acceptable, the flatwork should be designed to be independent of the building <br />foundations. The flatwork should not be doweled to foundations, and a separator should <br />be placed between the two. <br />4.To reduce shrinkage cracks in concrete, the concrete aggregates should be of appropriate <br />size and proportion, the water/cement ratio should be low, the concrete should be <br />properly placed and finished, contraction joints should be installed, and the concrete <br />should be properly cured. Concrete materials, placement and curing specifications should <br />be at the direction of the designer; ACI 302.1R-04 and ACI 302.2R-04 are suggested as <br />resources for the designer in preparing such specifications. <br />a. <br />b. <br />c. <br />d, <br />3 <br />2. <br />3. <br />301842-001 18 1610-038.SER.REV2 <br />7.B. - Page 76
The URL can be used to link to this page
Your browser does not support the video tag.