My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-05-21 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-05-21 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 3:10:38 PM
Creation date
5/17/2018 5:10:42 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/21/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
725
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5/21/2018 <br />Creek Adjacency <br />• No study of elevations of adjacent waterways, or rise and fall of water levels of the creek <br />• "Narrow" buffer zone of 20 feet horizontal distance from edge of parking lot to the creek <br />• No meaningful study of the vertical separation elevations between the proposed grade of the <br />parking lot and the creek <br />• "It is our opinion that the small horizonal and vertical "buffer" may be inadequate to properly <br />isolate the project from the creek" <br />• Study needed to assure that the Project will not adversely impact the water quality, flow or <br />safety of the creek from: <br />— Storm water surface flow and/or groundwater infiltration and potential connection <br />between the Project site and the creek <br />— Any negative impacts on Redwood Creek will immediately find their way into the nearby <br />San Francisco Bay <br />Redwood Creek - <br />A Major Local Environmental Feature <br />The interconnected surface water features just down stream appear to be <br />"environmentally significant and sensitive" <br />The ground and ground water beneath the area is geologically strongly <br />interconnected with and interrelated to these waterways <br />• Potential for storm water and groundwater to intercommunicate with the creek <br />and surface waterways <br />• No adequate study and analysis to show how the Project site can be properly <br />isolated from the adjacent Redwook Creek and downstream water bodies. <br />• Studies should address site drainage and groundwater transmission, both during <br />construction period and after the development of the proposed project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.