My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Cleary Consultants, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 Cleary Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2018 8:51:20 AM
Creation date
5/23/2018 8:46:08 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Cleary Consultants, Inc.
PROJECT NAME
Geotechnical Engineer for Veteran's Memorial Senior's Center and YMCA
RMP File Number
304.5
Date
5/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The areas where the borings will be required are locations where underground utilities may be <br />present, consequently, the services of a private locater will be secured and the help of the <br />Redwood City staff will be beneficial in locating and avoiding the utilities. <br />C. Environmental Soil Screening <br />Representative samples of the upper one to two feet of the on-site soils will be collected during <br />the drilling. The planned project site is estimated to be less than ten (10) acres, which requires <br />a minimum of eight (8) discrete soil samples to be collected and placed in sample containers, <br />stored in a cooler with cold packs and then delivered to a lab for testing. <br />Soils analysisforeach samplewill include: <br />TPH EPA 8260B— Gas, TEPH -Extractable — Diesel— Motor Oil with silica gel cleanup, VOC's-EPA <br />82606, Semi -volatiles - EPA 8270, Pesticides and PCB's - EPA 8081/8082, CAM 17 Metals, <br />Chromium VI EPA 7199, Arsenic and Lead STLC and Asbestos CARB 435A. <br />The test results generated by the laboratory will be forwarded to the Owner along with a formal <br />review of the soil screenings. <br />D. Arrangements / Exclusions <br />Removal of obstructions (including fencing) to allow access to boring locations by a truck <br />mounted drill rig is excluded from this scope. <br />Reasonable precautions shall be taken to minimize surface and subsurface damage however <br />through the normal course of work some rutting may occur, the correction of which is not <br />included in this scope. <br />E. Schedule <br />Field work (drilling & sampling) <br />Lab results of soils analysis <br />Final Report <br />3 weeks after Notice to Proceed <br />2-3 weeks after sample collection <br />3 weeks after lab results <br />Page 12 or 14 <br />REV: 05-02.1815 <br />ATTY/AGR.2018.093/Cleary Consultants, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.