Laserfiche WebLink
6. Preparation of geotechnical report for the design and construction of the <br />project. The report will include findings and recommendations for the <br />following: <br />a. Local geology and seismic setting. <br />b. 2016 CBC seismic design criteria. <br />C. Building foundation types, allowable bearing pressures, and minimum <br />foundation depths and widths. <br />d. Estimated foundation settlements. <br />e. Swimming pool wall design recommendations. <br />f. Subgrade preparation and aggregate base sections for new concrete <br />walkways. <br />g. Support of interior and exterior concrete slabs -on -grade. <br />h. Treatment of expansive soils (as required). <br />i. Pavement design: asphaltic concrete and aggregate base sections for <br />new asphalt driveways and parking lot areas. <br />j. Backfill and compaction of utility trenches. <br />k. Percolation testing. <br />1. Surface and subsurface drainage. <br />M. Any other unusual design or construction conditions encountered in the <br />investigations. <br />B. Geologic and Seismic Hazards Assessments, <br />The Geologic and Seismic Hazards Assessment portion of the report forthe project will consist of <br />the following: <br />1. Discussion of geologic and seismic conditions containing data on an assessment <br />of the nature of the site and potential earthquake damage including: <br />a. Regional geologyand seismic conditions and historical information onthe <br />seismicity of the local and regional area. <br />b. Location of known active and potentially active faults near the site, as <br />well as nearby inactive faults. <br />2. Site specific ground motion analysis - maximum considered earthquake ground <br />motion for the site in accordance with the California Building Code, latest <br />edition. <br />3. Potential for ground rupture related to faulting, liquefaction, lateral spread, <br />seismic settlement and differential compaction, land sliding, flooding and dam <br />failure inundation with recommended mitigation measures, where appropriate. <br />Page 11 of 14 <br />REV: 05-02-18 JS <br />ATTY/AGR.2018.093/Cleary Consultants, Inc. <br />