<br />Brian lee, City of Redwood City <br />Sluice Gate Dredging Proposal <br />November 6, 2008 <br />Page 3 <br /> <br />It is assumed that Public Works staff at the City will prepare the Standard and General <br />Conditions for the specifications, review the Bid Document package, and issue the actual <br />Call for Bids. M&N will assist the City with identifying likely contractors for the work, <br />anSwer questions related to the Call for Bids, attending a pre-Bid meeting, and provide <br />assistance with Contractor selection. <br /> <br />.~... <br /> <br />5. Design SUDDort Durina Construction <br /> <br />M&N will provide engineering support during construction by answering Requests For <br />Information and attending up to 4 half-day meetings/sitevisits (1 pre-construction, 1 final <br />site walk, 2 interim project meetings). <br /> <br />Fee & Schedule <br /> <br />The estimated fee for the work is shown on the attached spreadsheet. M&N proposes to <br />invoice for time and materials expended, on .a monthly basis, based on our standard rate <br />schedule as attached.. <br /> <br />Workcanbecornpleted per the following schedule: <br /> <br />Preliminary Design Memorandum 4 weeks from NTP (completed by Dec. 12) <br />75% complete drawings 7 weeks from NTP (completed by Dec. 23) <br />100% complete drawings 1 week from receipt of comments <br />(completed by Jan9) <br /> <br />Thank you for the opportunity to offer our services on this project, and I look forward to <br />supporting you and the City on this dredging project. Should you have any questions, please <br />contact me or Dilip Trivedi at your convenience <br /> <br />Sincerely, <br />MOFFATT & NICHOL <br /> <br />~J_~~ <br /> <br />Cllk,poe. <br />Project Manager <br /> <br />M:\2008Proposa/s\08003 Gehaf'flA20 -Redwood Shores Dredging PSEN3Lae-Scopa-11-06-08.doc <br /> <br />\ <br />