<br />Brian Lee. City of Redwood City <br />Sluice.Gate Dredging Proposal <br />November 6,2008 <br />Page 2 <br /> <br />1A:lnvestigate Additional Areas Benefiting From Dredging <br /> <br />We have added this task to assess if areas other than in the vicinity of sluice gates may <br />benefit from dredging, Which would be presented in the bid documents as Additive Bid <br />Alternate items. This would be based on meetings with City maintenance staff,andreview <br />of the hydrographic survey. Dredging and disposal of this additional material will require <br />the same tasks (estimate volume, apply for permits, investigate placement location at Area <br />H, and show on bid documents as additive bidaltemate items). <br /> <br />We have included.anaJlowancefor this item, rather than a fee, because it is difficult to <br />estimate the levelot effort without knowing if the item will be included in the bid documents <br />or not. We will bill tOWards this task only if additional work is perfOrmed, which can be <br />determined after we meet and discuss with your maintenance staff and weed removal <br />contractor. <br /> <br />--~..--~ <br /> <br />2. Identify Potential. Disposal Location <br /> <br />Based on prior lagoon dredging studies, M&N had determined thatthef'$ were no upland <br />areas around the perimeter of the lagoon where material could be permanently disposed. <br />The only feasible options were beneficial reuse for offsite wetland restoration projects,or <br />placing it In the lagoon within contained cells. To address the srnallervolume ofdredged <br />material that is spread out at individual gate locations, we will re-assess the feasibility of <br />temporarily stockpiling the material and trucking it to offsite authorized disposal sites such <br />as landfills or the Area H restoration project. The feasibility of dredging and trucking the <br />rnaterialfrom the intake channel will also be assessed. We will evaluate the following <br />sites: <br /> <br />. Trucking to Inner Bairlsland <br /> <br />. Trucking to Area H wetlands restoration site <br /> <br />. Trucking to LandfiHsand/or Recycling Plants in the Vicinity <br /> <br />3. PraDare Preliminarv Desiqn Memorandum <br /> <br />This task includes developing a preliminary design memo for the proposed work, which will <br />include a description of construction activities, duration of work, and constructlon costs. It <br />will include the proposed dredging of the lagoon at the sluice gate locations and the intake <br />channel, along with an assessment of potential disposal site locations. <br /> <br />A memo summarizing the findings and recommendations of the above tasks will be <br />provided, along with associated graphics and tables. A recommended Schedule of Work <br />Activities including design and construction phases will also be included in the report, <br />which will be needed for permit processing. <br /> <br />4. PreDare Bid Documents <br /> <br />A Bid Document package will be prepared for the City, which will consist of Design <br />Drawings, Technical Specifications, and a Bid Schedule. Submittals will be provided at <br />75% and 100% complete stages. Additionally, an Engineer's Estimate of Construction <br />Costs will be included. <br /> <br />M.~008 Proposa'~080(j3 Generaf\20 - Redwood Sh~s Dradglng PSt:\BLee-$cope-11-06-08.doc <br /> <br />~ <br />