My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 Moffatt & Nichol Engineer
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Moffatt & Nichol Engineer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 4:22:17 PM
Creation date
1/3/2006 10:26:40 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Moffatt & Nichol Engineers
PROJECT NAME
engineering & design services
RMP File Number
304
Date
12/28/2005
MO Ref
05-222, 08-220, 13-132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'" <br /> <br />Brian Lee, City of Redwood City <br />Construction Support Scope <br />November 17,2009 <br />Page 2 <br /> <br />3. Contract Close-Out <br /> <br />This task includes reviewing the post-dredge survey and final quantity estimates prepared <br />by the contractor, attending the final jobwalk meeting, reviewing final punch lists, and <br />reviewing the inspector's Final Inspection Report. <br /> <br />~~~~ <br /> <br />Fee & Schedule <br /> <br />The estimated fee for the work is shown on the attached spreadsheet. M&N proposes to <br />invoice for time and materials expended, on a monthly basis, based on our standard rate <br />schedule as attached. <br /> <br />This would be a request for Amendment 3 to our contract - dredging projects, particularly <br />specialized projects such as lagoon dredging, are becoming increasingly difficult to implement <br />and permit due to the nature of the work. It is also very difficult to estimate design and <br />engineering costs for such projects at the onset because a lot depends on sediment quality <br />and disposal locations. Of interest is the fact that with the requested modification, our total <br />contracted fee to date which includes preparing bid documents, coordinating sediment <br />sampling, providing permit support, and providing construction support will total less than <br />about $110,000. <br /> <br />Thank you for the opportunity to offer our services on this project, and we look forward to <br />continuing to support you and the City on this dredging project. Should you have any <br />questions, please contact me or Jack Fink at your convenience <br /> <br />Sincerely, <br />MOFFATT & NICHOL <br /> <br /> <br />"'" <br /> <br />Dilip Trivedi, Dr.Eng., P.E. <br />Principal I Project Manager <br /> <br />D:\BLee-Amend No. 3_11-17-09.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.