Laserfiche WebLink
51. Stormwater BMPs - Stormwater Pollution Prevention Program Best <br />Management Practices (BMPs) for construction shall be implemented to protect <br />water quality, in accordance with the approved Stormwater Pollution Prevention <br />Plan (SWPPP). BMP plan sheets are available electronically for inserting into <br />project plans. [SDR][ENGINEERING] <br />Street Infrastructure Improvements <br />52. Streetlights - A new streetlight shall be installed, if needed, as determined by the <br />City Engineer. The style and location of all streetlights shall be as determined by <br />the City Engineer and Planning Manager. [SDR][ENGINEERING] <br />53. Repair or Replace Street Infrastructure - Restore streets surrounding the <br />project site to the satisfaction of the City Engineer at project completion. When <br />this requires additional pavement restoration, the Engineer shall approve the <br />preferred layout of pavement markings. [SDR][ENGINEERING] <br />54. Parking Garage Ramps - Parking garage ramps shall meet the Design Criteria of <br />the Engineering Standards and consider safety and visibility of pedestrians to <br />the satisfaction of the City Engineer. Access controls shall be designed and placed <br />in such a way that vehicles do not block the public sidewalk or queue in the <br />public right -of- way. The access control system shall be delineated in the <br />building permit submittal. Person doors with panic hardware and alarms shall be <br />installed at or adjacent to gates between private and public parking to allow the <br />safest emergency egress path of travel. [SDR][ENGINEERING] <br />Fire and Safetv <br />55. Emergency Responder Radio Communications System - This project is <br />required to have an Emergency Responder Radio Communications System <br />(ERRCS) installed in accordance with CFC 510 and NFPA 122 1 . The only <br />exception to this requirement is when native radio system coverage levels are <br />within acceptable limits as determined by Fire Department approved third party <br />testing. <br />56. Fire Department Knox Building Access - Knox Key boxes are required as <br />part of this project to allow emergency access for firefighters. Indicate on the <br />plans that Knox Key boxes will be provided at all entrances to the buildings at <br />locations approved by the fire department. Recessed key boxes shall be <br />installed at all entrances five to six feet above finished grade CFC 506. <br />57. Available Water Supply to Project Site - Provide current fire flow information <br />from the water purveyor to indicate the maxim um available water flow in <br />gallons per minute (GPM) at a minimum of 20 pound s per square inch <br />ATTY/RESO.0041/CC RESO DENYING THE APPEAL FOR 353 MAIN STREET RESO NO. 15665 <br />REV: 05-14-18 PR MUFF NO. 603 <br />Page 18 of 29 <br />