My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 Fehr & Peers Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Fehr & Peers Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 8:26:16 PM
Creation date
1/3/2006 11:29:30 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Fehr & Peers Associates
PROJECT NAME
prof transportation plng & consultation
RMP File Number
304
Date
12/15/2005
MO Ref
05-223
Box
6589
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Scope of Services <br /> <br />Fehr & Peers will assist Redwood City with updating the City's Transportation Impact Fee (TIF) <br />program. The goal of the TIF update is to support a comprehensive transportation network that <br />accommodates the traffic and transportation generated by new development in the City. This <br />analysis will demonstrate the nexus between the local fees and the impacts created by new <br />development over a 20-year period. <br /> <br />Phase 1- Five-Year TIF Report <br /> <br />Task 1-1 - Assist City Staff with Five- Year Report <br /> <br />Government Code Section 66001(d) calls for a five-year report (after the first deposit into the <br />TIF account) that includes findings regarding fee purpose, funding sources and anticipated <br />amounts, and approximate dates of funding acquisition. We anticipate that City staff will take the <br />lead in preparing the five-year report with input provided by Fehr & Peers. Text from previous <br />annual reports is expected to be used to develop the required findings, and we propose to <br />provide 40 hours of staff time to review the five-year report and provide input regarding project <br />status implementation issues. <br /> <br />Phase 11- TIF Proaram Update <br /> <br />Task 11-1 - Summary of Growth Projections and Current Fee Status <br /> <br />A key input to the traffic forecasting process is the estimate of future development in Redwood <br />City and in surrounding cities. The San Mateo City/County Association of Governments <br />(C/CAG) travel demand model is currently in the process of being updated and will likely not be <br />available for use on this project by late 2005 and early 2006. Thus, we propose to use the <br />current version of the C/CAG model that was developed using land use projections based on <br />ABAG's Projections 2000 and includes refined zonal land use figures for 2025. We will <br />summarize these projections and present them to City staff for their review prior to incorporating <br />them into the travel model. <br /> <br />We will convert the future land use in Redwood City into Dwelling Unit Equivalents (DUEs), <br />using the same conversion factors process used in the original TIF study, but updated using trip <br />rates from the latest edition of Trip Generation (Seventh Edition, 2003). The land use forecasts <br />will be prepared for the City as a whole, and not broken down into smaller geographic areas or <br />districts. Thus, our analysis will not address the potential for district-specific fees. <br /> <br />The City will provide information on the funds collected to date through the TIF program, and the <br />projects constructed using those funds. We will summarize the information provided in a <br />technical memorandum. <br /> <br />Task 11-2 -Identification of Transportation Improvement Projects and Cost Estimates <br /> <br />Because of the limited amount of time that has elapsed since the original TIF analysis was <br />prepared and due to the reduced existing traffic volumes due to the economic downturn, we <br /> <br /> <br />4 <br /> <br />fþ <br /> <br />~.! fP,& I'E¡=RS <br />
The URL can be used to link to this page
Your browser does not support the video tag.