My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Associated Right of Way Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Agmt18 Associated Right of Way Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 4:49:06 PM
Creation date
5/29/2018 4:56:47 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Associated Right of Way Services, Inc.
PROJECT NAME
Right of Way Support Services for 101/Woodside Interchange Project
RMP File Number
304
Date
5/25/2018
MO Ref
18-082
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Chapter Affected Environment, Environmental Consequences, <br />and Avoidance and Minimization Measures <br />Table 2.1.4-1: Proposed Permanent Right -of -Way Changes and Temporary Construction <br />Easements <br />No. APN <br />Address <br />Type of Development <br />Type of Property Requirement <br />TCE; partial acquisition along comer of <br />Woodside Rd/Bay Rd and Woodside Rd <br />17 054-012-120 <br />Broadway <br />Mixed-use: Longs Drug <br />frontage. No change to structures; <br />potential removal or relocation of <br />approximately 35 parking spaces. <br />18 054-012-100 <br />11201 Broadway <br />Mixed-use: Denny's <br />Full acquisition <br />1205 Broadway <br />Mixed-use: Jack in the <br />TCE; partial acquisition along Broadway <br />19 054-012-050 <br />St <br />Box <br />frontage. No change to structures or <br />parking. <br />TCE; partial acquisition along southbound <br />20 054-011-060 <br />1400 Broadway <br />St <br />Industrial: Corp Yard <br />US 101 off -ramp and Broadway frontages. <br />Potential removal of three structures and <br />small number of parking spaces. <br />1498 Oddstad <br />Industrial: Public <br />TCE; partial acquisition along the <br />21 052-431-060 <br />Dr <br />Storage <br />southbound US 101 off -ramp. <br />TCE; partial acquisition along Blomquist St <br />22 052-392-470 <br />Blomquist St <br />Industrial <br />frontage. Potential relocation of existing <br />_ fence. No change to structures or parking. <br />23 052-435-010 <br />1513 Veterans <br />Commercial/Office: <br />Full acquisition <br />Blvd <br />Parking Lot <br />TCE; partial acquisition along comer of <br />Seaport Blvd/Blomquist St and Blomquist <br />24 NA UPRR Railroad St frontage. No change to structures; <br />potential removal or relocation of <br />approximately 2 parking spaces. <br />TCE; partial acquisition along comer of <br />25 NA UPRR Railroad Seaport Blvd/Blomquist St. Potential <br />relocation of utility cabinet. No change to <br />structures or parking. <br />TCE; partial acquisition along Bay Rd <br />26 054-062-120 720 Bay Rd Commercial/Office frontage. No change to structures or <br />parking. <br />27 NA Seaport Blvd I Utility TCE <br />N =Assessor's parcel number; NA =Not applicable; TCE =Temporary consf uction easement. Full and partial acquisitions <br />described in the table are proposed permanent changes. <br />property where the building currently sits. Both Build Alternatives would affect approximately <br />6,600 square feet of the 25,200 -square -foot parcel. As part of the building would be affected, it is <br />assumed that the project would render the business inoperable, and a full acquisition of the <br />property would be needed. The next closest Denny's franchise location is 5 miles north in San <br />Mateo, California. Denny's is open 24 hours a day and employs between 20 and 49 employees. <br />Adequate notice of the restaurant closure or displacement would minimize impacts to employees. <br />There are many other casual food restaurants in the area, and the level of turnover in the service <br />industry is often high (Macke 2013). In addition, Redwood City is expected to continue to see <br />commercial and job growth. Job growth between 2010 and 2040 in the BroadwayNeterans <br />Boulevard corridor is estimated at 40 percent (ABAG and MTC 2013b). Therefore, other <br />employment opportunities are anticipated to be available for displaced employees. <br />US 1011Woodside Road Interchange <br />Improvement Project 2-25 December 2016 <br />ATTY/AGR.2018.091/Associated Right of Way Services Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.