My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt97 DES Architects & Enginee
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1997
>
Agmt97 DES Architects & Enginee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2006 4:06:11 PM
Creation date
1/12/2006 4:03:46 PM
Metadata
Fields
Template:
Agreement
Contractor Name
DES Architects & Engineers
PROJECT NAME
RWS fire staton
RMP File Number
304
Date
1/15/1997
Reso Ref
12856
Box
6103
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Architectural and Engineering services associated with the design and development of <br />site support facilities may include a visitors parking zone, staff parking zones, fleet <br />vehicle parking zone, various covered and uncovered storage structures and zones, design <br />of an on-site, above ground, fuel station for diesel and unleaded fuels in proximity to an <br />emergency generator. All site development features will be based upon the Redwood <br />Shores Fire Station and Maintenance Facility Conceptual Program dated July 25, 1996, as <br />prepared by DES Architects + Engineers, Inc. <br /> <br />F. <br /> <br />The design of the site emergency generator shall be part of this contract. DES will design <br />a location for generator and establish potential power demand needs for the new fIre <br />station building and satellite maintenance facility. The generator shall be sized <br />adequately to provide power for three 75 horse power water pumps associated with the <br />existing City owned water shortage tank. <br /> <br />G. <br /> <br />The City shall provide power demand needs for the water tank facility and design data on <br />the methodology for connection to that facility as well as construction scope definition. <br /> <br />Architectural consultation and process coordination for the selection of a Construction <br />Manager/General Contractor. This process will be similar to the selection process <br />developed for the City Hall project currently under construction. It will consist of two <br />phases. Phase One will be prequalification of Construction Manager/General Contractor, <br />and Phase Two will be the selection of the Construction Manager/General Contractor. <br /> <br />H. <br /> <br />Phase I <br /> <br />Phase II <br /> <br />Potential additional services provided at City direction: <br />1. Participation in "value engineering" sessions with the Architect and CM/CG. <br />2. Work with CM/GC to prepare/modify CSI Specification Division 1 documents to <br />comply with the construction contracting process. <br />Work with CM/GC to facilitate a sub-contractor prequalification, listing, <br />solicitation and bid receipt and tabulation process that complies with City of <br />Redwood City legal requirements. <br />Facilitate and coordinate the assembly of the fmal CM/GC's Guaranteed <br />Maximum Price (GMP) and presentation to City Council for approval. <br />Any other construction contract process consulting necessary to implement Phase <br />III, Sections A and B as referenced in the CM/GC section of this scope statement. <br /> <br />.., <br />-'. <br /> <br />4. <br /> <br />5. <br /> <br />Programming Phase <br /> <br />The Programming Phase for this project is complete <br /> <br />Schematic Design <br /> <br />A. <br /> <br />Participate in a follow up fact fmding workshop/listening session with the <br />neighbors immediately adjacent to the project site. The purpose of this workshop <br />will be to better understand the neighbor's concerns so that they may be <br />incorporated into the design. City Staff will lead and organize this workshop. <br /> <br />Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.