My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 Korve Engineering
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Korve Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2006 9:58:42 AM
Creation date
1/18/2006 9:57:46 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Korve Engineering
PROJECT NAME
traffic study - transportation planning
RMP File Number
304
Date
1/18/2000
MO Ref
06-004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SCOPE OF WORK <br />REDWOOD Cm DOWNTOWN PRECISE I'LAN <br /> <br />Task 12 Response to Comments <br /> <br />KORVE will respond to comments on the draft EIR related to traffic. Responses will be limited to <br />clarification to the analysis and results as undertaken. Response to comments for analysis not <br />undertaken will be discussed with the City and an appropriate response will be formulated. A total of <br />24 hours is assumed at this time for response to comments. <br /> <br />Task 13 Project Meetings <br /> <br />A total of three meetings with City staff are assumed. One meeting in Task 1 and two meetings <br />throughout the remainder of the project. The project meeting budget includes time for both <br />preparation and attendance time. <br /> <br />Task 14 Public Hearings <br />A total of four public meetings/hearings are assumed in conjunction with this project. <br /> <br />Budget <br /> <br />The project budget is based on the scope of work as outlined above. We have established the <br />budget at $71,590 to conduct the analysis for the proposed project, prepare the documentation, <br />respond to comments, and attend meetings as noted. <br /> <br /> Task Total <br />Task 1 Project Initiation/Start-Up $1,720 <br />Task 2 Establish Study Area $1,590 <br />Task 3 Documentation of Transportation Assumptions $3,350 <br />Task 4 Project Site Review $3,216 <br />Task 5 Establish Future Baseline Traffic Volumes $5,350 <br />Task 6 Develop Project Traffic Projections $9,890 <br />Task 7 Traffic Impacts and Mitigation Measures $8,302 <br />Task 8 Transit Evaluation $4,462 <br />Task 9 Non-Motorized Travel Evaluation $4,540 <br />Task 10 Draft Report $11,400 <br />Task 11 Final Report $4,440 <br />Task 12 Response to Comments $3,250 <br />Task 13 Project Meetings $3,580 <br />Task 14 Public Hearing $5,500 <br />SubTotal $70,590 <br />Other Direct Costs $1,000 <br />TOTAL $71,590 <br /> <br />KaNe Engineering, Inc. <br /> <br />4 <br /> <br />December 5, 2005 <br /> <br />_0._.-"" . -.-. ..- <br />
The URL can be used to link to this page
Your browser does not support the video tag.