My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-06-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-06-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 4:05:50 PM
Creation date
6/7/2018 6:21:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/11/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.C. - Page 1 <br />REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />June 11, 2018 <br />SUBJECT <br />Award of Contract — 2017-2018 Sanitary Sewer Replacement Project <br />RECOMMENDATION <br />By motion, approve and authorize the City Manager to execute the contract documents <br />and award the standard form construction contract 00520 for the 2017-2018 Sanitary <br />Sewer Replacement Project to the lowest responsible bidder, Casey Construction Inc.of <br />Emerald Hills, California, and waive any irregularities, for their low bid of $4,488,680.00; <br />and, authorize the City Manager to increase the contract amount, if necessary, up to <br />10% of the original contract amount, not to exceed $4,937,548.00; and confirm <br />determination that the project is exempt and meets California Environmental Quality Act <br />(CEQA) exemption criteria as set forth in Section 15302 (Replacement or <br />Reconstruction) of the CEQA Regulations <br />BACKGROUND <br />The City systematically replaces sections of aging sanitary sewer infrastructure to <br />ensure the continued reliability of the system. Each year, staff identifies pipelines that <br />required excessive maintenance or experienced repeated service disruptions and target <br />those pipelines for improvement. <br />On January 28, 2013 the Sanitary Sewer Master Plan (SSMP) updated the 2008 Master <br />Plan. The SSMP is used to guide improvements to City's wastewater collection system. <br />Pipeline deficiencies and future capacity upgrades are identified based on existing <br />conditions analysis and projected wastewater generation based on modeling of future <br />and existing development. <br />Staff completed closed circuit television inspection review of Sanitary Sewer Basin <br />Numbers 5A and 5D in 2015. Staff's review of the inspection videos revealed numerous <br />defects in these sewer basins. A number of construction options for repair or <br />replacement were evaluated to determine the most cost-effective method for mitigation. <br />For this project, a combination of the traditional open trench method and the "pipe - <br />bursting" method (a trenchless method of replacing buried pipelines) were chosen in <br />order to replace the identified pipe defects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.