My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15676
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2018
>
Res18 15676
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 8:06:14 AM
Creation date
6/12/2018 5:11:20 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0051/CC RESO APPROVING THE DOWNTOWN PLANNED COMMUNITY PERMIT – 851 MAIN ST PROJECT – EXHIBIT A <br />REV: 05-31-18 PR <br />Page 10 of 16 <br />seasonal groundwater table; and a brief summary of how the project is complying with Provision C.3 of the MRP. [COA][ENGINEERING] 45. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management Practices (BMPs) for construction shall be implemented to protect water quality, in accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). BMP plan sheets are available electronically for inserting into project plans. [SDR][ENGINEERING] Street Infrastructure Improvements 46. Streetlights - A new streetlight shall be installed, if needed, as determined by the City Engineer. The style and location of all streetlights shall be as determined by the City Landscape Architect. [SDR][ENGINEERING] 47. Repair or Replace Street Infrastructure - Restore streets surrounding the project site to the satisfaction of the City Engineer at project completion. When this requires additional pavement restoration, the City Engineer shall approve the preferred layout of pavement markings. [SDR][ENGINEERING] 48. Reconstruction of Frontage Streets - The City has identified the need for street reconstruction along Walnut Street fronting the project site, including a minimum of a 2” grind and overlay for the project frontage. Additional reconstruction may be required if the construction of the project adversely affects the existing pavement. [SDR][ENGINEERING] 49. Parking Garage Ramps - Parking garage ramps shall meet the Design Criteria of the Engineering Standards and consider safety and visibility of pedestrians to the satisfaction of the City Engineer. Access controls shall be designed and placed in such a way that vehicles do not block the public sidewalk or queue in the public right-of-way. The access control system shall be delineated in the building permit submittal. Person doors with panic hardware and alarms shall be installed at or adjacent to gates between private and public parking to allow the safest emergency egress path of travel. [SDR][ENGINEERING] 50. Parking Data & Signage – The project shall collect (utilizing sensors, loop detectors, or equivalent technology) and make publicly available, real-time garage occupancy data (via a parking app or other means deemed appropriate by the City and a sign at the garage entrance). [COA][ENGINEERING] 51. Shoring for Excavations – No tiebacks shall extend into the public right of way or onto adjacent properties without the written agreement of the City and/or private property owner. Any tie-backs within the City’s right of way shall be de-tensioned prior to permit sign-off and/or project acceptance. [COA] [ENGINEERING] Construction-Related Activities
The URL can be used to link to this page
Your browser does not support the video tag.