ATTY/RESO.0051/CC RESO APPROVING THE DOWNTOWN PLANNED COMMUNITY PERMIT – 851 MAIN ST PROJECT – EXHIBIT A <br />REV: 05-31-18 PR <br />Page 11 of 16 <br />52. Pre-Construction Meeting - After City permits are approved, but prior to start of construction, hold a preconstruction conference with Engineering and Building staff and other interested parties. The developer shall arrange for the attendance of the construction manager, contractor, and all subcontractors who are responsible for grading and erosion and sedimentation protection controls. [COA][ENGINEERING] 53. Construction Management and Staging - Prior to encroachment permit issuance, submit a construction parking management plan, which shall outline the number of construction workers by phase, phase duration, where parking will be located for each phase. Construction parking, material storage, equipment, or other construction- related uses are not allowed within the City right of way without prior approval from the City Engineer. [COA][ENGINEERING] 54. Lane Closures - Traffic control for lane closures shall conform to the Work Area Traffic Control Handbook. Street closures require submission of traffic control plans and approval in advance. [SDR][ENGINEERING] 55. Public Parking During Construction – Temporary parking meter permits shall be issued prior to removing any public parking spaces from public use during construction. An application fee of $30.00, together with the parking meter fees applicable for the expected duration of the temporary parking meter permit ($2.00- $8.00 daily per space depending on location) shall be paid in advance prior to issuance of the permit. [SDR][ENGINEERING] 56. Winterizing - If construction is not complete by the start of the wet season (October 1 through April 30), implement a winterization program to minimize the potential for erosion and sedimentation. As appropriate to the site and status of construction, winterization requirements shall include inspecting/maintaining/cleaning all soil erosion and sedimentation controls prior to, during, and immediately after each storm event; stabilizing disturbed soils through temporary or permanent seeding, mulching, matting, tarping or other physical means; rocking unpaved vehicle access to limit dispersion of much onto public right-of-way; and covering/tarping stored construction materials, fuels, and other chemicals. Plans to include proposed measures to prevent erosion and polluted runoff from all site conditions shall be submitted for approval by CDD prior to beginning construction. As site conditions warrant, the City Engineer may direct the applicant to implement additional winterization requirements. [COA][ENGINEERING] 57. Grading – Grading shall be performed in accordance with the City’s Engineering Standards. Soil or other construction materials shall not be stockpiled in the public right-of-way. Submit cut/fill volumes (CY) for all soils to be imported to or exported from the site. [SDR][ENGINEERING] 58. Monitoring - The Soils Engineer shall conduct continuous site inspections during trenching and backfill operations at the applicant’s expense. The Soils Engineer shall take compaction tests and submit the results to Engineering & Construction.