Laserfiche WebLink
April 17, 2002 <br /> <br /> Mr. Tom Passanisi <br /> City of Redwood City <br /> 1017 Middlefield Road <br /> Redwood City, CA 94064 <br /> <br />· Re: Response to - Marina Shores Village Project EIR, Request for Additional Data <br /> from Project Applicant <br /> <br /> Dear Tom: <br /> <br /> It is our understanding that the attached information completes our response to the <br /> March 6. 2002 request for additional date for the Marina Shores Village EIR from <br /> Wagstaff and Associates. We also understand that it completes our required responses to <br /> those ascertained from the package of correspondence between the Redwood City <br /> planning staffand the engineering department with a cover letter dated March 13, 2002. <br /> <br /> Enclosed are the water and sewer demand calculations for the proposed project as <br /> well as a comparison to the existing uses. As you can see, our proposed plan is a very <br /> water efficient development. The vast majority of water use is attributable to the <br /> residents and their water use inside the homes, as would be the case for any residential <br /> development. Estimated water required for lawn and landscaping is approximately 5% of <br /> all water use. <br /> <br /> We have also provided additional information that we feel is ex!remely relevant. <br /> An attached Table B summarizes this additional inform3:ion <br /> We believe that the 2.25 person per home standard (which is their lowest <br /> standard) required by Redwood City is significantly higher than what our <br /> project will ultimately house. As can be illustrated by the high-rise traffic <br /> count standard of approximately.38 peak hour trips per resident, our <br /> resident profile is anticipated to be older, without children. We anticipate <br /> our actual resident count in the 1.75 to 2.0 residents per home range. The <br /> resulting water demand at a 2.0 resident count is 42,460 GPD lower, <br /> resulting in a total of 416,869 GPD gross and 383,030 GPD net of the <br /> existing uses. <br /> In addition, this information does not include the boats and the 155 live- <br /> aboard boaters that were on-site at Peninsula Marina prior to demolishing <br /> the marina as the first stage in this development. Per our records, the <br /> actual marina water consumption was approximately 20,000 GBD. <br /> Subtracting them out of the total would result an actual anticipated net <br /> water use increase due to the development of our proposed project of <br /> approximately 363,030 GBD. <br /> <br /> 650 hair Island, Redwood CiD, CA 94063 650.369.8646 fa:; 650.369.8126 <br /> <br /> <br />