|
Redwood City Phase 1- VMB 5/2/2018
<br />FIRM DISIPLINE DD CD DD + CD
<br />ELS ARCHITECTURE AND URBAN DESIGN Architecture and A/E Team Management 889,220.00$ 1,351,995.00$ 2,241,215.00$
<br />ELS ARCHITECTURE AND URBAN DESIGN + Edson Design Interior Design + Furnishings 100,000.00$ 150,000.00$ 250,000.00$
<br />Sandis Civil 37,750.00$ 45,750.00$ 83,500.00$
<br />SWA Landscape Architecture 68,000.00$ 88,000.00$ 156,000.00$
<br />Forell Elsesser Structural 69,000.00$ 115,000.00$ 184,000.00$
<br />Integral Group MEP, Fire Protection & Alarm, Low Voltage Systems 189,300.00$ 220,800.00$ 410,100.00$
<br />Integral Group T24 Modeling 4,500.00$ 5,500.00$ 10,000.00$
<br />Integral Group LEED/ZNE Modeling 26,500.00$ 24,100.00$ 50,600.00$
<br />Integral Group Daylight Modeling 13,500.00$ 7,000.00$ 20,500.00$
<br />Integral Group LEED MEP 10,000.00$ 20,000.00$ 30,000.00$
<br />Integral Group LEED 17,700.00$ 17,700.00$ 35,400.00$
<br />Shalleck Collaborative Theatre 26,000.00$ 45,000.00$ 71,000.00$
<br />Shalleck Collaborative AV -$
<br />Cambridge Seven Associates Exhibit Designer 129,420.00$ 131,760.00$ 261,180.00$
<br />Cortina Productions Multi-Media 94,530.00$ 94,530.00$
<br />EOS Exhibit Lighting Design 5,000.00$ 5,000.00$
<br />Natalie Zannechia Graphics 30,400.00$ 30,400.00$
<br />Charles M Salter Acoustics 15,000.00$ 25,000.00$ 40,000.00$
<br />Top Flight Specifications Specifications 10,000.00$ 23,800.00$ 33,800.00$
<br />The Preview Group Code - Life Safety 3,740.00$ 4,180.00$ 7,920.00$
<br />Mack5 Cost Estimate 30,400.00$ 37,400.00$ 67,800.00$
<br />Syska - Hennessey Elevator 10,000.00$ 15,000.00$ 25,000.00$
<br />SGH Building Envelope 20,000.00$ 30,000.00$ 50,000.00$
<br />EOS (Overall Building)Lighting Design 19,900.00$ 25,000.00$ 44,900.00$
<br />Cambridge Seven (Project-wide)Environmental Graphics 15,000.00$ 25,000.00$ 40,000.00$
<br />Fall Protection TBD 20,000.00$ 20,000.00$ 40,000.00$
<br />Muller Kitchen/Food Service 20,000.00$ 30,000.00$ 50,000.00$
<br />TOTALS 1,744,930.00$ 2,587,915.00$ 4,332,845.00$
<br />4,332,845.00$
<br />EXHIBIT BB -1
<br />REV: 06-15-18 VR
<br />ATTY/AGR/2018.128/ELS ARCHITECTURE & URBAN DESIGN 6.1.D. - Page 20
|