Laserfiche WebLink
Redwood City Phase 1a- Traffic Calming Measures 5/2/2018 <br />For Designated Intersections along Valota and Madison <br />FIRM DISIPLINE DD CD DD + CD <br />ELS ARCHITECTURE AND URBAN DESIGN Architecture and A/E Team Design Management 62,280.00$ 124,560.00$ 186,840.00$ <br />Blue Zones w/Dan Burdan Traffic Calming Expert 30,000.00$ 10,000.00$ 40,000.00$ <br />Toole Design Group Roadway and Intersection Design/Engineering -$ 233,534.00$ 233,534.00$ <br />SWA Landscape 30,000.00$ 50,000.00$ 80,000.00$ <br />Mack5 Cost Estimate 10,000.00$ 15,000.00$ 25,000.00$ <br />TOTALS 132,280.00$ 433,094.00$ 565,374.00$ <br />565,374.00$ <br />EXHIBIT BB - 2 <br />REV: 06-15-18 VR <br />ATTY/AGR/2018.128/ELS ARCHITECTURE & URBAN DESIGN 6.1.D. - Page 21