My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 ELS Architecture and Urban Design
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Agmt18 ELS Architecture and Urban Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2026 11:30:47 AM
Creation date
7/9/2018 5:36:05 PM
Metadata
Fields
Template:
Agreement
Contractor Name
ELS Achitecture and Urban Design
PROJECT NAME
Veterans Memorial Building/Senior Center-YMCA Project and Related Traffic Calming Solutions
RMP File Number
304
Date
6/25/2018
MO Ref
MO. 18-107
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Additional Services <br />Certain items of work are not included in basic services but can be performed as <br />additional services if required. These items include, but are not necessarily limited to <br />the following: <br />1. Bid and Construction Administration phases. <br />2. Expedited Schedule, including fast -tracked, multiple early bid and <br />construction packages. Including phased construction documents, <br />beyond those phases identified in Exhibit FF, requiring issuance of <br />separate multiple packages. <br />3. Providing out-of-town travel In addition to that specified. <br />4. Providing professional renderings or models, and ELS effort required to <br />coordinate with special rendering for model -making consultants. <br />5. Building code variances or modifications, if required, will be provided as an <br />additional service. <br />6. Preparing Project Record Drawings, As -Built Drawings, and/or As -Built BIM <br />documentation. <br />7. Design and engineering of any new gas service by PG&E or other gas utility. <br />s. Commissioning services, "enhanced" or otherwise, for LEED or building. <br />9. Design and engineering for relocation of the high voltage power lines, <br />including the undergrounding of such utilities and/or related design and <br />engineering for shared and joint trenches for such utilities. <br />10. Responding to or making revisions due to peer review or other comments if <br />out of sequence with the design schedule, except for those comments that <br />identify missing scope, coordination errors, or code violations. <br />Suspension/Extension/Completion <br />If the project is suspended for more than three months or if either the Design <br />Development or Construction Documents phases are extended by more than three <br />months, fees could be subject to renegotiation to consider the additional cost of <br />working in a later time period. Basic services end on the scheduled completion date. <br />Effort beyond this date could be subject to additional services. <br />Exclusions <br />The following items of work are excluded: <br />1. Removal of hazardous materials. <br />2. Site, boundary, utility and topographic survey. <br />3. Geotechnical analysis and soils report. <br />4. Obtaining and paying for construction permits. <br />5. Paying for LEED Building Registration and Certification or similar building <br />owner credential. <br />REV: 06-15-18 VR <br />Page 14 of 14 <br />ATTY/AGR/2018.128/ELS ARCHITECTURE & URBAN DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.