Laserfiche WebLink
<br />Green Environment inc, <br />Subsurface Investigation Proposal <br />City Parking Lot Between 2053 and 2065 Broadway Avenue, Redwood City, CA <br /> <br />Page 5 <br /> <br />Project Estimated Costs <br /> <br />Work will be performed on a time and material basis, according to the attached 2006 GEl <br />Schedule of Charges and with a not-to-exceed provision. Budget is as follows: <br /> <br />Task 1. <br /> <br />Pre-Field Activities <br /> <br />$ 1,650 <br /> <br />Tasks 2-5. Drilling, Sampling & Well Installation <br /> <br />$14,500 <br /> <br />Task 6. <br /> <br />Groundwater Well Quarterly Sampling <br /> <br />$ 4,000 <br /> <br />Task 7. <br /> <br />Laboratory Analyses <br /> <br />$ 8,500 <br /> <br />Task 8. <br /> <br />Reports Preparation <br /> <br />$10,500 <br /> <br />Task 9. <br /> <br />Well Closure <br /> <br />$ 3,850 <br /> <br />TOTAL ESTIMATED COST (not to exceed): <br /> <br />$43,000 <br /> <br />Project Limitations <br /> <br />All GEl project work will be conducted under the terms, conditions and limitations as <br />specified in the separate legal Agreement signed by City of Redwood City and GEL The <br />proposed project does not include a site specific risk assessment, a receptor survey, any <br />remedial activities, soil or groundwater management plans, work associated with the <br />development and recording of deed restrictions, the disposal of Class I hazardous waste, or <br />any work that may be required by the SMCoGPP or any other party and not included in the <br />proposed scope of work herein. <br /> <br />************************************************************************ <br /> <br />Respectfully submitted: <br /> <br />Mark Green <br />President <br />Green Environment inc. <br /> <br />~ <br /> <br /> <br />,f1u~I.' r¡}WMl' <br /> <br />