My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-02-13
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-02-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2006 9:52:51 AM
Creation date
2/9/2006 3:03:08 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
2/13/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1C <br />Page 1 <br /> <br />REPORT <br /> <br />To the Honorable <br /> <br /> <br />February 13, 2006 <br /> <br />Subject <br />Agreement for Professional Services with CSG Consultants, Inc (CSG) for providing <br />Construction Management Services for the Redwood City Recycled Water Project - <br />Phase I - Redwood Shores Distribution System - Bid Packages 1 and 2 (BP 1 & BP 2) <br /> <br />Recommendation <br />Approve and authorize execution of an agreement with CSG Consultants, Inc. of San <br />Mateo, California, for providing Construction Management Services for both BP 1 and <br />BP 2 of the Redwood City Recycled Water Project - Phase I - Redwood Shores <br />Distribution System for the time and material cost of $754,324.00. <br /> <br />Background <br />In December 2005, the City assembled a selection panel for the purpose of selecting a <br />construction management firm to provide construction management and inspection <br />services for the above two projects (Bid Package 1 & Bid Package 2). <br /> <br />CSG Consultants, Inc, a San Mateo City-based company, was chosen based on their <br />qualifications and experience in working on similar projects throughout the Bay Area. <br />They have extensive applicable experience, and proved to be the most qualified out of <br />the four finalists, to complete the job. <br /> <br />The two pipeline construction projects (Bid Packages 1 and 2) are the first distribution <br />system projects needed to deliver recycled water to existing commercial irrigation and <br />City roadway landscape customers in the western area of Redwood Shores. As the <br />name of these projects infer, the work is the beginning of the distribution system <br />construction component of the Recycled Water Project. They consist of the installation <br />of the main transmission piping system in Redwood Shores along Radio Road, Marine <br />Parkway, Oracle Parkway, Twin Dolphin Drive, Shoreline Drive, and a small section of <br />Redwood Shores Parkway. More than 25,000 feet of pipes with sizes ranging from 8 <br />inches to 30 inches in diameter will be constructed in approximately eight months. The <br />companion recommendation to award the construction contract for Bid Package 1 is <br />included in tonight's City Council Agenda under a separate staff report. Bid Package 2 <br />- estimated at $3.5 Million, is scheduled for bid opening on February 22, 2006. <br /> <br />Alternatives <br />1. Council can elect to not enter into this Agreement with CSG, and begin a new <br />process to select a construction manager. However, that would negatively impact <br />the timely involvement and proper management of the pipeline construction project. <br /> <br />Page 1 of 2 <br /> <br />--"_.... .--,-_. ..----....----"------.". -,- .,.-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.