Laserfiche WebLink
<br />. September 2004, Redwood Shores Community Meeting. <br />. January 2005, 2nd Redwood Shores Community Meeting. <br />. March 2005, Planning Commission (1st meeting) <br />. April 2005, Planning Commission (2nd meeting) <br />. June 2005, Planning Commission (3rd meeting) <br />. September 2005, Planning Commission (4th meeting) <br /> <br />7A <br />Page 3 <br /> <br />The Policy has also been made available for public review and comment via the City's <br />website. <br /> <br />On January 29, 2004, the City's Planning Manager sent a letter to all waterfront property <br />owners asking them to halt any construction which had a direct impact on the lagoon bank. <br />The purpose of this action was to allow City staff enough time to prepare the Lagoon Bank <br />Policy which would establish construction guidelines for waterfront properties in an effort to <br />preserve the integrity of the lagoon bank. City staff was concerned about possible bank <br />failure and wanted to establish some guidelines to protect the bank and to give appropriate <br />guidance to property owners. (Please refer to Attachment 1: Draft Lagoon Bank Policy & <br />Construction Guidelines and Attachment 2 for the Planning Manager's letter) <br /> <br />The Policy sets a framework for permitting "new" construction as well as modifying <br />"existing" improvements on the Redwood Shores Lagoon bank. By identifying typical <br />sections and establishing a series of zones the Policy looks to provide guidelines for <br />construction within each zone, while maintaining the integrity of the existing lagoon bank. <br />Given the variety of conditions and set of potential circumstances each waterfront property <br />was and each application will be reviewed on its individual merits. The level of City review <br />will depend on the location of the subject property, the specific portion of the lagoon bank, <br />and the scope of work proposed. However, as with any City review process where <br />circumstances may vary the Policy has included both a process by which an applicant can <br />apply for an exception and/or file an appeal of a decision. <br /> <br />At the April 5,2005 Planning Commission meeting the Planning Commission directed staff <br />to conduct a Waterfront Inventory to identify the number and overall conditions of the <br />existing waterfront improvements on the Redwood Shores Lagoon. Upon completion ofthis <br />task staff identified 565 waterfront properties.s Each property was assessed for type of <br />waterfront improvements, evaluated and photographed. The properties were then logged <br />into a data base and categorized according to potential significance with respect to the <br />waterfront improvements. Of the 565 waterfront properties 186 properties were identified <br />with some form of nonconforming improvement(s). These 186 properties were categorized <br />into three different levels of significance. The remaining properties did not have any <br />noticeable improvements and were therefore, not give a level of significance rating. <br /> <br />Twenty-one (21) properties were identified with "Level 3 significance", which has been <br />defined as properties with waterfront improvements that have life safety issues or <br />potentially significant structural issues (i.e., damaged boat docks, footings into lagoon <br />bank, large retaining walls, etc.) This represented approximately 4% of the waterfront <br />properties inventoried. <br /> <br />Ninety-one (91) properties were identified with "Level 2 significance", which has been <br /> <br />s The 565 properties inventoried included individual residential properties, common areas maintained by <br />Homeowner's Associations, and commercial properties. Properties containing multiple units (such as <br />condominiums or business parks) with one or more common areas were inventoried per common area. <br /> <br />.-,... ........,"._------,.._-~_.,..,_..__..,-'_.__.__.._--,...... <br />