Laserfiche WebLink
<br />Network in accordance with this Section 4. For the purposes of this Agreement, <br />City-owned and/or occupied facilities, located within the geographic limits of the <br />City shall be deemed as being within the City's jurisdictional area. <br /> <br />5. <br /> <br />Fiber Network. Fiber construction shall consist of two (2) dedicated fibers connected <br />between the sites identified in Attachment A and the City of Redwood City City Hall. <br /> <br />5.1 <br /> <br />5.2 <br /> <br />5.3 <br /> <br />6 <br /> <br />Fiber Owned by Grantee. The Fiber Network will be owned and maintained by <br />Grantee. <br /> <br />Fiber Network Sites. The applicable Qualified Fiber Network User will provide <br />the route and the access from the property line of the Fiber Network Site into the <br />facility. Reasonable efforts will be undertaken by Grantee to cause the Fiber <br />Network distribution system and drops to share common paths with Grantee's <br />Subscriber Network in order to minimize costs to the Qualified Fiber Network <br />Users. Fiber Network Sites may pass through another Fiber Network Site to <br />return to a Node (provided that the effect shall in no way increase the number of <br />Fiber Optic strands at any point in the Fiber Network with a through-put above <br />two (2)). This portion ofthe Fiber Network will be owned and maintained by <br />Grantee. Final route selection will be at the sole discretion of Grantee. The <br />Qualified Fiber Network Users will provide all underground conduits and, where <br />installation is to be by an aerial attachment, the Qualified Fiber Network User <br />must confirm that the fiber can be placed aerially. Qualified Fiber Network Users <br />also will supply Grantee, in advance, with blueprints, if available, or a diagram of <br />the building indicating demarcation location on the exterior of the building. <br />Grantee will provide construction to the Demarcation Point at a cost to be paid by <br />the Qualified Fiber Network User on a site by site and bid by bid basis for time, <br />labor and materials. Service and Maintenance will be provided on a time, labor <br />and materials basis. The City shall determine if and to the extent that the <br />Qualified Fiber Network User may use Fiber Network Construction Credits <br />available under the Franchise Agreement to pay such costs, as these costs were <br />not included in the computation for the amount of Construction Credits by site. <br /> <br />Network Equipment. Grantee shall not install or be responsible for any Fiber <br />Network equipment; however, the City may use the Construction Credits to the <br />extent set forth in Exhibit B for the purchase of edge and switching equipment, at <br />its discretion. <br /> <br />5.4 <br /> <br />New Fiber Network Locations. The City may, at any time during the term of the <br />Franchise request that new or additional public facilities in the City be connected <br />to the Fiber Network beyond those sites identified in Attachment A. Within <br />ninety (90) days of receipt of a request from the City, Grantee shall provide a <br />quotation as to the then-current Construction Cost for connection of such new or <br />additional location. For all new requests not identified in Attachment A the City <br />shall pay all related costs to provide a design and quote for the Construction Cost. <br />If the public agency elects to be connected and agrees to pay the full cost of such <br />