My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 Comcast of California
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Comcast of California
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 8:31:17 AM
Creation date
3/4/2006 8:33:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Comcast of California IX
PROJECT NAME
francise agreement
RMP File Number
304
Date
3/1/2006
MO Ref
06-010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />connection, or if construction credits are available, Grantee shall complete such <br />connection, in a timely manner after receipt of the City's written acceptance of the <br />quoted connection charge and, in any event, within ninety (90) days of receipt by <br />Grantee of all permits or other governmental authorizations required to complete <br />the connection. In no event shall such connection exceed a through-put of two (2) <br />strands of fiber. <br /> <br />Construction Credits. The City has been granted $674,613.17 in Construction Credits to <br />install the Fiber Network to the locations outlined in Attachment A. These credits will be <br />made available in two (2) installments. On April 30, 2006, $346,751.17 in Construction <br />Credits will be available for the City's use in constructing the Fiber Network. On <br />January 31,2007, $327,862.00 in Construction Credits will be available to the City's use <br />in constructing the Fiber Network. <br /> <br />6. <br /> <br />6.1 <br /> <br />6.2 <br /> <br />The Grantee agrees that the cost to construct the Fiber Network will not exceed <br />the estimated costs in Exhibit B of the Franchise. <br /> <br />Change in Allocation of Construction Credits - The City has ninety (90) days <br />from the effective date of the Franchise Agreement to provide the Grantee with its <br />final list of Fiber Network Sites. If any sites are eliminated from the list of Fiber <br />Network Sites, the Grantee will provide the City with the amount of Construction <br />Credits which may be used towards PEG Equipment. City and Grantee agree that <br />the reallocation of Construction Credits will take into consideration any increased <br />Construction Costs as a result of the elimination ofthe Fiber Network Site from <br />the Fiber Network. The reallocation of Construction Credits will be paid in <br />accordance with Exhibit B, Section 2(c) of the Franchise. <br /> <br />7. <br /> <br />Fiber Network Construction. <br /> <br />7.1 <br /> <br />7.2 <br /> <br />7 <br /> <br />The Fiber Network shall be constructed in phases, as follows: <br /> <br />(a) <br /> <br />In accordance with Section 6.2, City shall as soon as practicable and no <br />later than ninety (90) days of the date of this Agreement, provide Grantee <br />a final document, which specifies the sites to be served by the Fiber <br />Network. The Grantee will inform the City within sixty (60) days of <br />receipt of the City's final document as to the schedule of phased in <br />construction of the Fiber Network. <br /> <br />(b) <br /> <br />Upon receipt of said final document Grantee will have sixty (60) days to <br />provide City with the Reallocation of Construction Credits to the City's <br />PEG Equipment Capital Grant. The reallocation of Construction Credits <br />will be paid in accordance with Exhibit B, Section 2( c) of the Franchise. <br /> <br />Construction and Activation. The construction of the Fiber Network shall be <br />substantially completed on or before December 31, 2007. Fiber Network <br />Activation will occur as the City procures equipment necessary for Activation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.