My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-03-13
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-03-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2007 1:53:08 PM
Creation date
3/9/2006 2:36:20 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
3/13/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />VII. <br /> <br />7C <br />Page 16 <br /> <br />Assumption: a single vehicle on a route through Downtown that might include <br />stops at Caltrain station, Sequoia Station shopping center, Downtown/Civic <br />Center destinations, Kaiser Medical Center, and extend westerly to serve a <br />limited neighborhood along direct routes (e.g. Roosevelt, Jefferson) with stops at <br />Red Morton Community Center and Veterans Memorial Senior Center. Shuttle <br />would circulate at 20 to 30 minute intervals, depending on number of stops and <br />traffic conditions. <br /> <br />Student/senior off-peak - (4 routes/ vehicles, 9:30 am-3:30 pm Monday -Friday): <br />Estimated cost of $375,000 for annual operating expenses. <br /> <br />San Carlos Scoot style (18 routes, 8 vehicles, 6 am-8:30 pm Mon- Fri): <br />Estimated cost is $1,900,000 for annual operating expenses <br /> <br />h. Rail/ferry (future) <br />. Terminal construction <br />. Vessels (2 @ $6 million each) <br />. Annual operating costs <br /> <br />$11 million <br />$12 million <br />$ 5 million <br /> <br />III. <br /> <br />Fire <br />a. Restore Enaine #9 <br />Engine 9 is currently out-of-service 104 shifts per year. Based upon current <br />salary and benefit schedules, the annual cost of reinstating E9 to full time <br />status is $406,000. <br /> <br />v. <br /> <br />Public Safety Regarding the Downtown <br />Although Council will receive a full report regarding the Police Department as it <br />related to the downtown on May 27th, the Mayor and Vice Mayor have asked that <br />we also provide the annual costs of the following positions as part of this report, <br />. Police Officer = $150,000 <br />. Police Sergeant = $202,000 <br />. Community Service Officer = $83,000 <br />. Parking Enforcement Officer/Casual Part-Time = $18,000 <br /> <br />Youth/Education <br />b. Plavfields <br />The table below represents what will be proposed in the Capital Improvement <br />Program for field conversions from natural to synthetic turf. Prices range from <br />$600,000 (Hawes) to $1,250,000 (McGarvey, which is a multiuse) per field. If <br />approved by Council, just under $7,000,000 will be devoted to this program <br />through fiscal year 07/08. <br /> <br />3 <br /> <br />----.-.--. -...-. _. <br />
The URL can be used to link to this page
Your browser does not support the video tag.