My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 BKF Engineers, Surveyors, Planners
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Agmt18 BKF Engineers, Surveyors, Planners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 5:13:13 PM
Creation date
9/4/2018 5:12:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers, Surveyors, Planners
PROJECT NAME
2018 Sanitary Sewer CIP
RMP File Number
304
Date
8/30/2018
MO Ref
18-144
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DELIVERABLES: <br />Consultant shall deliver to the City the following: <br />1. City approved AutoCAD 2009 and AutoCAD Civil 3D drawing files of the Project <br />Limits <br />2. As -Built maps requested from utility companies in PDF format <br />FEE SCHEDULE: <br />The Consultant shall perform the Scope of Work described above for a payment <br />not to <br />exceed $188,912.00 and at the itemized prices outlined on the table below. The <br />Consultant shall be paid per street as itemized below upon receipt and satisfactory <br />acceptance of deliverable(s) for each street by the City. <br />The City also reserves the right to delete a street or portion of work prior <br />to mobilization <br />onto that particular street. The cost of the delete street(s) is deducted from the table <br />below. <br />Consultant's Topographic and Mapping cost: <br />Reference <br />Estimated Level of Effort <br />Level of Effort <br />Costforthis <br />Street <br />Map <br />length of in Hours <br />in Hours <br />Street <br />Survey (LF) (Field) <br />(Office) <br />Silver Hill Road <br />I Basin 5G <br />2,282 29 <br />48 <br />$15,393.58 <br />Goodwin Ave <br />Basin 5G <br />2,067 <br />27 <br />43 I <br />$13,943.26 <br />Fernside St <br />Basin 5G <br />447 <br />6 <br />9 <br />$3,015.31 <br />Alameda De <br />Basin SG <br />209 <br />I 3 <br />4 <br />$1,409.84 <br />Las Pulgas <br />Mitchell Way <br />Basin 5G <br />235 3 <br />5 <br />$1,585.23 <br />Granger Way Basin 5G <br />908 12 <br />19 <br />$6,125.05 <br />Sterling Way Basin 5G <br />338 4 <br />7 <br />$2,280.03 <br />Virginia Ave Basin 5G <br />1,767 <br />23 <br />37 <br />$11,919.57 <br />Stulsaft ParkBasin <br />5G 2,882 <br />36 <br />60 <br />$19,440.97 <br />Stambaugh St <br />Basin DT2 3,684 <br />I 46 <br />77 <br />$24,850.98 <br />Pine St <br />Basin DT2 189 2 <br />4 <br />$1,274.93 <br />Willow St <br />Basin DT2 <br />360 5 <br />7 <br />$2,428.43 <br />Laurel St <br />Basin DT2 <br />357 5 <br />7 <br />$2,408.20 <br />Manzanita St <br />Basin DT2 <br />717 I <br />9 <br />15 <br />$4,836.63 <br />Page 14 of 18 <br />REV: 06-29-18 PR <br />ATTY/AGR.2018.151/BKF Engineers, Suveyors, Planners <br />
The URL can be used to link to this page
Your browser does not support the video tag.