My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-09-10 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-09-10 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 8:39:31 AM
Creation date
9/6/2018 5:49:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/10/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• A request for traffic calming on Valota Avenue was received and evaluated, but <br />does not appear to qualify for a project at this time because the prevailing speeds <br />were under 30 mph (28.2 mph). <br />Staff recommends that the top priority intersections (#1, #2, #3 listed above) identified <br />through the community workshops be added to Phase I of the overall Project. These <br />intersections will be studied during the CEQA process to identify potential impacts <br />before any permanent changes are made. <br />While the CEQA analysis is conducted and construction drawings are developed, short- <br />term solutions to increase traffic safety at the top priority intersections and areas of <br />concern could be deployed. These include temporary measures such as painted <br />medians, painted bulb -outs, tree planters, and temporary signage. Staff would need to <br />work with our traffic calming consultant to design pilot traffic calming improvements, to <br />the extent feasible, for the intersections identified through the community workshops. <br />This work would occur in the context of other traffic calming initiatives in the community. <br />Currently, there are several other traffic calming efforts underway, and neighborhood <br />traffic calming requests outstrip available funding. In many cases, significant <br />neighborhood outreach has already occurred and residents are in line for project <br />funding for traffic calming projects. While the long term solutions for the traffic calming <br />measures associated with the Madison Avenue/Valota Avenue neighborhood would be <br />funded through the overall Project, if appropriate following CEQA analysis, pilot <br />measures could not be funded by Project resources. Costs for short-term solutions at <br />identified top priority intersections and areas of concern would be in the range of <br />$100,0004150,000 and should be considered with the FY 2019-20 Capital Improvement <br />Program. <br />Other traffic calming treatments for the intersections identified "B", "C", "D", "E", "F" and <br />"G", on "Exhibit A" will be evaluated through the CEQA process, and some may be <br />installed after the construction of Phase I and some may be installed after the <br />construction of Phase 11, depending on the success of the priority measures. <br />ALTERNATIVES <br />The City Council may choose to direct staff to develop new alternatives with the traffic <br />consultant and may choose to expand their scope of work. This may include more <br />meetings; revisions to the scope of the project; or other suggestions. <br />FISCAL IMPACT <br />The City Council approved the Professional Design Agreement with ELS Architecture <br />and Urban Design for Design Development/Construction Drawings on June 25, 2018 <br />for a total of $5.1 million. The scope of work includes the community outreach, <br />planning, and construction drawings for the traffic improvements of this Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.