My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-03-27
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2006 9:16:07 AM
Creation date
3/23/2006 1:37:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
3/27/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />APPENDIX 1 <br /> <br />UTILITIES AND SERVICE SYSTEMS <br />SCOPE OF SERVICES <br /> <br />6-1E <br />Page 34 <br /> <br />CITY OF REDWOOD CITY <br />FEBRUARY 27, 2006 <br /> <br />procedure that will derIDe the problems as detem1Íned by the technical analysis, and develop a <br />series of solutions with a comparison of advantages and disadvantages. Based on the work <br />executed by the finance specialists, a similar approach will be taken for the funding of <br />alternatives. <br /> <br />Task 10 - Meetings with City Staff or EIR Consultant <br /> <br />Six meetings with City Staff or the ErR consultant are budgeted. Meetings for each utility <br />system are anticipated. The following meetings are suggested: <br /> <br />1. Kickoff meeting, which includes our funding SUbcollsultant, Bartle Wells. At this meeting, <br />the roles and responsibilities of the project team. participants will be detennined. Project <br />schedule and key milestone dates will be established. Key goals and expectations of the <br />project team will be confinned and City financing objectives will be identified. In addition, <br />any other parties, such as developers who may have a significant interest in the project, will <br />be identified. <br /> <br />2. Brainstonning session to present and discuss the water system analysis. <br /> <br />3. Brainstorming session to present and discuss the sewer system analysis. <br /> <br />4. Brainstonning session to present and discuss the stonnwater system analysis. <br /> <br />5. Review of recommended mitigation. After completion of all of the utility analyses and <br />brainstonning sessions, the resulting recommendations for mitigation will be presented to <br />City staff or the EIR consultant. Bartle Wells will also participate in this meeting to present <br />their cost and funding findings and recommendations. Funding options will be discussed. <br /> <br />6. Review and presentation of study with attendance by Bartle Wells. <br /> <br />Task 1] -Prepare Responses to Public Comment <br /> <br />After the publication of the draft EIR, responses to public comments on the utility systems will <br />be prepared and incorporated into the final ElR. <br /> <br />Task 12 - Meetings with Planning Commission and City Council <br /> <br />Attendance at two meetings each with the Planning Commission and City Council are budgeted. <br />The first meeting with the Planning Commission should be a corollary to the sixth meeting under <br />Task 10 above, where the results of the study are presented. Discussions and comments from the <br />Planning Commission will be incorporated and finalized in preparation of the second meeting. <br /> <br />---. <br /> <br />---"-", <br /> <br />~---- <br /> <br />~ <br /> <br />5 of9 <br /> <br />.'YOND ""OIN"""'. <br /> <br />N:\BDNCS\Redwood City\Downtown Precise Plan\Delv\Final Scope - Ver 2_02-28-06.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.