My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-09-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-09-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 5:18:32 PM
Creation date
9/20/2018 5:27:29 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/24/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 5 <br />EXHIBIT "A" <br />I. Amend Survev Boundaries and Topographic Survev <br />Consultant's scope of services is amended to include surveying services (boundary survey and <br />topographic survey) to be provided by Consultant's sub -consultant BKF Engineers. <br />BOUNDARY SURVEY <br />Identify the limits of Redwood Creek right-of-way and establish the boundaries between adjacent property <br />owners, Prepare a record boundary of the portion of Redwood Creek bounded by Highway 101 to the <br />north, private properties to the east and west, and Bradford Street to the south, as shown on Exhibit B. In <br />addition, boundary information will include the recent work at 707 Bradford. <br />Deliverables: <br />1. Develop preliminary boundary survey, which will include extending a closed traverse throughout <br />the site, recovering available monuments, and tying the boundary to the monuments. <br />2. Resolve boundaries and prepare boundary base map in CAD format <br />3. Prepare line work for and overlay appurtenant existing easements adjacent to the Redwood Creek <br />parcel or over the Redwood Creek parcel per Title Reports provided by the City <br />TOPOGRAPHIC SURVEY <br />Prepare a topographic survey of Redwood Creek. The survey will include 25' beyond the top of bank on <br />both sides of Redwood Creek, extend up to Highway 101 to the north, and overlay the survey information <br />from the 707 Bradford project to the south. <br />Deliverables: <br />1. Provide a flown aerial topographic survey at 20 scale with 1' contours <br />Provide supplemental field topographic survey to provide greater context and detail within the limit <br />of work. Survey to include detailed grading of hardscape and landscape areas, surface utility <br />locations and elevations, and existing sidewalk, curb, gutter, asphalt and driveway limits <br />surrounding the proposed park limits. In addition, the field topographic survey will identify grades of <br />surface structures and utilities as well as detailed grading information above the water line, but we <br />have not included time to dip gravity utility structures within the private properties. <br />REV: 08-02-18 DZ <br />Page 3 of 7 <br />ATTY/AGR.Amend No. 1 /SERA Design and Architecture, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.