My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-09-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-09-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 5:18:32 PM
Creation date
9/20/2018 5:27:29 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/24/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 8 <br />2. Recreation Corridor <br />a. Examination of a linear connection stretching from the Library Campus (Site 2) all the way <br />to the Bay Trail <br />3. Incorporation of Site 7 <br />a. Identify ways that Arguello Park can be better incorporated into Downtown. <br />i. How can this space be used? How can the City design/take advantage of this <br />space? <br />ii. What are the goals/objectives for this space as identified in the Downtown Precise <br />Plan? <br />Deliverables: <br />1. Recommendations for Routes and Connectivity <br />2. Visual Integration of Proposed Park Locations <br />Task 2.6 — Cost Analysis <br />The analysis would examine the cost of the improvement options and amenities including adjustments to <br />the probable construction costs and operational costs from the previous phase for the selected sites by <br />Council. Consultant will review diagrams and cost estimates with city staff. The focus of this task will be the <br />Cost Analysis for the three selected sites. <br />Deliverables: <br />1. Forecasted Costs of Improvements <br />2. Operational and On-going Maintenance Cost Estimates <br />SCHEDULE <br />8 weeks total from execution of agreement. <br />TOTAL SUMMARY of Tasks: <br />$76,427.44 <br />REV: 08-02-18 DZ <br />Page 6 of 7 <br />ATTY/AGR.Amend No. 1 /SERA Design and Architecture, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.