Laserfiche WebLink
VIII COST FORECAST <br />APPENDIX <br />Redwood Creek Daylighting <br />It is understood that Redwood <br />City is interested in opportunities <br />to daylight the existing Redwood <br />Creek within the City Hall Parking <br />lot site. Based on construction <br />costs for similar creek daylighting <br />projects, a baseline assumption of <br />$10,800 total cost per linear foot <br />was assumed. <br />150 <br />Table 4: Preliminary Cost Forecast for Creek Daylighting <br />Public Parking Lot 450 $10,800.00 $4,860,000 <br />Parking and Walkway 300 $10,800.00 $3,240,000 <br />Adjacent to City Hall <br />Entire Site Length 750 $10,800.00 $8,100,000 <br />DOWNTOWN PARKS SITE ASSESSMENT 5 FEASIBILITY STUDY REPORT <br />ol <br />