My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-09-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-09-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 5:18:32 PM
Creation date
9/20/2018 5:27:29 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/24/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX <br />Potable Water Stora e <br />VIII COST FORECAST <br />g 00 <br />D <br />Table 1c: Preliminary Cost Forecast for Potable Water Storage @ Site 03 <br />Component Storage Volume (gal) Cost per Gallon Cost <br />Treatment System <br />500,000 Assumed Lump Sum $100,000 <br />Electrical <br />500,000 $0.23 $112,500 <br />Piping and Related <br />500,000 $0.15 $75,000 <br />Infrastructure <br />$100,000 <br />Total Cost per Potable <br />$1,037,500 <br />Water System <br />$225,000 <br />Table 1d: Preliminary Cost Forecast for Potable Water Storage @ Site 06 <br />Storage Tank <br />1,000,000 <br />$1.50 <br />$1,500,000 <br />Treatment System <br />1,000,000 <br />Assumed Lump Sum <br />$100,000 <br />Electrical <br />1,000,000 <br />$0.23 <br />$225,000 <br />Piping and Related <br />1,000,000 <br />$0.15 <br />$150,000 <br />Infrastructure <br />Total Cost per Potable <br />$1,975,000 <br />Water System <br />24 SEPTEMBER 2018 149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.