My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-09-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-09-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 5:18:32 PM
Creation date
9/20/2018 5:27:29 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/24/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VIII COST FORECAST <br />Potable Water Storage <br />APPENDIX <br />Table 1a: Preliminary Cost Forecast for Potable Water Storage @ Site 01 <br />To assist Redwood City with <br />1,000,000 <br />orageume(ga. <br />r Gallon <br />Cost <br />potable water storage feasibility <br />Assumed Lump Sum <br />$100,000 <br />Electrical <br />1,000,000 <br />and cost considerations, Tables <br />Storage Tank <br />500,000 <br />$1.50 <br />$750,000 <br />2a -d present general outlines <br />Infrastructure <br />of rough costs associated with <br />Treatment System <br />500,000 <br />Assumed Lump Sum <br />$100,000 <br />one potable water storage <br />system at four potential site <br />Electrical <br />500,000 <br />$0.23 <br />$112,500 <br />locations. Sites that present <br />available space opportunities <br />that could likely accommodate <br />Piping and Related <br />500,000 <br />$0.15 <br />$75,000 <br />potable water storage systems <br />Infrastructure <br />are Winslow Street, Library <br />Campus/ Roselli Park, City Hall/ <br />Total Cost per Potable <br />$1,037,500 <br />Main Street and Spring Street. <br />Water System <br />Storage tank sizes assumed are <br />based on approximate available <br />underground space per site. <br />Table 1b: Preliminary Cost Forecast for Potable Water Storage @ Site 01 <br />Storage Tank <br />1,000,000 <br />$1.50 <br />$1,500,000 <br />Treatment System <br />1,000,000 <br />Assumed Lump Sum <br />$100,000 <br />Electrical <br />1,000,000 <br />$0.23 <br />$225,000 <br />Piping and Related <br />1,000,000 <br />$0.15 <br />$150,000 <br />Infrastructure <br />Total Cost per Potable <br />$1,975,000 <br />Water System <br />148 DOWNTOWN PARKS SITE ASSESSMENT S FEASIBILITY STUDY REPORT <br />ol <br />
The URL can be used to link to this page
Your browser does not support the video tag.