Laserfiche WebLink
Meco saw <br />$108.00 <br />15% Mark-Up on Equipment <br />Materials/Shoring <br />Rate <br />Shoring <br />$1,300.00 <br />Dump Fees -Mud <br />$1,200.00 <br />Import Rock Bedding and <br />$1,200.00 <br />Base Rock <br />Concrete and Asphalt <br />$1,000.00 <br />15% Mark-Up on Materials <br />Page 7 of 7 <br />REV: 09-11-18 PT <br />ATTY/AGR.2018.213/Casey Construction Water Main Butterfly Valve <br />