My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 The Edcco Group
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Under $60K
>
Agmt06 The Edcco Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2008 11:02:39 AM
Creation date
3/29/2006 12:05:51 PM
Metadata
Fields
Template:
Agreement
Contractor Name
The Edcco Group
PROJECT NAME
Lakeview pump staton & reservoir
RMP File Number
304.5
Date
3/29/2006
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT IIAII <br /> <br />011 <br /> <br />- <br /> <br />~.. <br /> <br />The EDCCO Group, Inc. <br /> <br />Engineering and Control Solutions <br /> <br />P.o. Box411 <br />195 Glenn Way, Suite 100 <br />San Carlos, Calif. 94070 <br />em ail: info@EDCCO.Com <br /> <br />Phone (65063-SCADA <br />Phone (650) 364-6683 <br />FAX (650) 649-2328 <br /> <br />Jimmy Tan <br />City of Redwood City, Engineering and Construction <br />1017 Middlefield Road <br />Redwood City, CA. 94063 <br /> <br />March 14, 2006 <br /> <br />VIA Email <br /> <br />SUIUECT: <br /> <br />LakeView Pump Station and Reservoir <br />Quotation for Engineering Services <br /> <br />Revision D <br /> <br />We are pleased to offer the following quotation for Electrical Engineering, Construction Support, PLC <br />programming, and integration into the existing SCADA system per The City of Redwood City's requirements: <br />a. Preliminary Design <br />i. The work shall include all necessary tasks to complete the preliminary investigation of the <br />Lakeview pump station related to electrical service. The work shall include, field <br />reconnaissance of the existing electrical service, evaluating/coordinating the electrical <br />and telephone services with PG&E and SBC respectively, coordinating the location of the <br />SCADA and Electrical components in the proposed building, preparation of preliminary <br />design drawings and meeting with the City to discuss the operational strategy for the <br />pump station. (Please include 2 days of meetings for this task) <br />ii. Submittal under this task shall include: Preliminary design drawing including site plan, <br />demolition plan and details of the electrical/telephone utilities and SCADA facility. Submit <br />a preliminary cost estimate for the electrical portion of the work. <br />iii. The City will provide preliminary Civil Site Plans and proposed building drawings in <br />AutoCAD, if available, for your use. <br /> <br />b. Final Design/Construction Support <br />i. The work shall include all necessary tasks to complete the final design of the project. <br />The work shall include incorporating the City's review comments for the preliminary <br />design and proceeding with the final design drawings for the project, preparation of all <br />technical specifications related to electrical and SCADA work, providing instrumentation <br />design drawing, conducting programming changes to the SCADA system, writing a PLC <br />program, reviewing shop drawing submittals and RFI's for the electrical components, and <br />assisting with the inspection during construction and startup. <br />ii. Submittal under this task shall include: All final design drawings including plans and <br />details related to the electrical/telephone utilities and SCADA facility. Submit Technical <br />Specifications and Final Design Cost Estimate. <br />iii. The City will review the final design drawings and will conduct a review meeting to <br />discuss the comments. Please include (1) day of meeting for this task. <br />iv. Incorporate City's review comments and submit Final "stamped" drawings for inclusion <br />into the Contract Documents. <br /> <br />Item 1 <br />Electrical Engineering and design for Lakeview Pump Station to include site investigations, coordination with PG&E and <br />SBC, two or three electrical drawings, narrative of demolition plan, and section 16000 Electrical for inclusion to City's <br />bid/construction documents. Includes coordination with Civil disciplines and changes to Civil drawings for utility pads <br />and/or access. Final drawings will be stamped. To be done on a Time and Coot basis. <br />Principal Engineer $151.00/hr <br />Senior Engineer $134.00/hr <br />CADD Operator $104.00/hr <br />Administrative Support $67.00/hr <br />Auto Mileage IRS Standard <br />General Administrative Expenses 5% of Labor <br /> <br />est. 48 <br />est. 24 <br />est. 30 <br />est. 8 <br />est. 200 miles <br />
The URL can be used to link to this page
Your browser does not support the video tag.