My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-04-03
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-04-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 12:49:42 PM
Creation date
3/30/2006 2:45:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
4/3/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />78 <br />Page 27 <br /> <br />\ <br /> <br />DOWNTOWNREDWOODCnY <br />A Parking Management Proposal. <br /> <br />Budget <br /> <br />We propose to provide our complete .serviceson an actual cost basis, <br />and each month will provide aM disclosure statement which details <br />an costs incurred in the operation of thefaciJities, with. separate detail <br />sheets showinglaÞQr. lal:)or burden, overhead, and any building and <br />equipment costs. We h~ve the ability to provide separate statements <br />for each location, along with as.ingJe 'roll-up'showing total revenues <br />and expenses at all three facitities on a combined basis, if this would <br />be considered desirable by the City. <br /> <br />We've attached proforma estimates of operating expenses (Tab 812) <br />.for each .of thefaciJities for your review. These estimates are based 00 <br />the operating parameters set forth by the City .and our proposed plan of <br />operation .and are open for dìscussion, as the- final shape of the overall <br />parking program takes shape. We have provided individual cost <br />estimates for each of the facilities as well as a 'rolJ-up'shoWÎng the <br />combined cost to operate all facilities. <br /> <br />We've also include a brief Notes page, which seeks to clarify the basis <br />for each line item expense. We look forward to discussing our <br />proposed plan and estimated operating costs with the appropriate City <br />personnel. <br /> <br />As its fee fot providing the management services discussed herein at <br />all three facilities, Ampco System Parking wìll ineludea flat monthly <br />management fee of $3,000 on the Monthly Operating Statement, plus <br />.a data processing fee of $750 per month to cover all of our accounting, <br />bookkeeping, and .statementpreparationcosts, including the cost to <br />provide our proprietary SCORE parking acqounting software. These <br />costs have been allocated to each location in the attached proforma <br />estimates based on the number of parking spaces contained ¡Reach, <br />but we would be happy to apportion these costs to the faciJitîe$ in .any <br />way that meets the City's needs. <br /> <br />Ampco's management fee and data processing felà shall be fixed for <br />the initial two-year term of the contract. . <br /> <br />Ampco System Parking <br />Page 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.