My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2018-079319 IA_10.12.2018
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Improvement Agreement
>
RecDoc 2018-079319 IA_10.12.2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2019 9:51:18 AM
Creation date
10/17/2018 2:14:52 PM
Metadata
Fields
Template:
Recorded Docs
Subject
Kaiser Medical Office Building 2
Doc Num
2018-079319
Rec Date
10/12/2018
Address
1175 Marshall / 905 Maple St
Parties
Kaiser Foundation Hospitals
MO Ref
18-182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2018-079319 CONF <br />9:52 am 10/12/18 AG Fee: NO FEE <br />Count of pages 26 <br />RECORDING REQUESTED BY - ) Recorded in Official Records <br />AND WHEN RECORDED MAIL TO: ) County of San Mateo <br />Mark Church <br />City of Redwood City ) Assessor -County Clerk -Recorder <br />1017 Middlefield Road ) <br />Redwood City, California 94063 ) II I I II II II I I I I I I I I I I I I II II <br />Attention: City Clerk ) *$ R 0 0 0 2 6 1 6 9 9 7$ <br />) <br />(Space Above This Line forRecordWr Use Only) <br />Exempt from recording fee per Gov. Code § 27383. <br />IMPROVEMENT AGREEMENT <br />Keiser - Medical Office Building 2 <br />of�S ROVEMENT AGREEMENT ("Agreement") is made and entered into on this k day <br />, 2018 (.Effective Date") by and between by and between Kaiser Foundation <br />Hospitals, a California nonprofit public benefit corporation ("Developer"), and the CITY OF REDWOOD <br />CITY, a charter city and California municipal corporation ("City") with reference to the following facts: <br />RECITALS <br />A . Developer is the current fee owner of that certain real property consisting of <br />approximately 8.3 acres located within the City of Redwood City, County of San Mateo, State of <br />California, described in Exhibit A, attached hereto and incorporated herein by reference (the "Property"). <br />13. On February 6, 2018, the Planning Commission of the City of Redwood City adopted, <br />among other approvals, Resolution No. 18-01, approving a Planned Community permit and a Planned <br />Development permit for the construction of Medical Office Building 2 ("MOB2") and the demolition of <br />the existing Tower Medical Office Building ("Tower MOB") and Oak Medical Office Building ("Oak <br />MOB"), subject to certain conditions of approval ("Conditions") (collectively the "Projecn. <br />C . The Conditions, in particular Conditions 16(d) and 16(e), require that Developer enter <br />into an agreement with City providing for the future construction of specified public improvements as set <br />forth below prior to the issuance of a building permit. <br />D . Developer has submitted to City plans, specifications and drawings entitled 905 Maple <br />Street Improvements and Kaiser Permanente Kaiser Redwood City Medical Center Parking Structure C, <br />prepared by BKF Engineers and dated A to u5k 15 , 20_$ (the "Improvement Plans'), which, in addition <br />, <br />to other improvements, provide for c on- and off-site public improvements consisting of street and <br />street light improvements, storm drain systems, domestic water systems and sanitary sewer systems for <br />the Project (collectively, "Initial Improvements"). Developer has also submitted conceptual plans for, and <br />Conditions require completion of, additional improvements to ultimately be completed at the end of the <br />Project ("Ultimate Improvements"). The general location of the Initial Improvements and Ultimate <br />Improvements are described in Section 3. The Initial Improvements together with the Ultimate <br />improvements are referred to as the "Improvements". <br />E . The hmmprovement Plans, in addition to other improvements, provide for a new recycled <br />water main and services for the Project (collectively, "Marshall Street Recycled Water Improvements"). <br />A portion of the Marshall Street Recycled Water Improvements consists of an upgrade of the 10" outside <br />diameter HDPE DR 11 pipe to a larger outside diameter HDPE DR 11 pipe, and new recycled water <br />REV: 08-29-18 PR <br />Pagel of 24 <br />ATTY/AGR.2018.202/Kaiser MOB2 - IA <br />
The URL can be used to link to this page
Your browser does not support the video tag.