My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2018-079319 IA_10.12.2018
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Improvement Agreement
>
RecDoc 2018-079319 IA_10.12.2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2019 9:51:18 AM
Creation date
10/17/2018 2:14:52 PM
Metadata
Fields
Template:
Recorded Docs
Subject
Kaiser Medical Office Building 2
Doc Num
2018-079319
Rec Date
10/12/2018
Address
1175 Marshall / 905 Maple St
Parties
Kaiser Foundation Hospitals
MO Ref
18-182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the request of Developer, which request shall be accompanied by a written assurance acceptable to the <br />City Engineer that the securities required by Section 14 shall remain enforceable throughout the term of <br />the extension. <br />5. Estimated Cost of Work and the FF Work. The engineer's estimated cost of the Work is <br />Three Million Eight Hundred Two Thousand Six Hundred Ninety -Four and No/100 Dollars <br />($3,802,694.00) (`Estimated Cost of Work"). Being portions of the Work, the engineer's estimated cost <br />of the Marshall Street Recycled Water Improvements is Four Hundred Eighty -Three Thousand Eighty - <br />Nine and No/100 Dollars ($483,089.00), and the engineer's estimated cost of the Maple Street Potable <br />Water Improvements is Four Hundred Eighty -Three Thousand Two Hundred Seventy -Nine and No/ 100 <br />Dollars ($483,279.00). The engineer's estimated cost of those portions of the Work comprising the FF <br />Work is One Hundred Fifty -Nine Thousand One Hundred Eighty -Two and No/100 Dollars ($159,182.00) <br />("Estimated Cost of FF Work"). <br />6. Modifications to the Plans. Approval of this Agreement by City does not release <br />Developer of its responsibility to correct mistakes, errors or omissions in the Improvement Plans. If, at <br />any time, in the opinion of the City Engineer, in his reasonable discretion, the Improvement Plans are <br />deemed inadequate with regard to fulfilling the intent of the approved Planned Community permit and <br />Planned Development permit and of the Conditions, Developer agrees to make such modifications, <br />changes or revisions as necessary in order to complete the Work in a good and workmanlike manner in <br />accordance with accepted design and construction standards and consistent with the Conditions, <br />Improvement Plans, and the above cited Planned Community and Planned Development permits. <br />7. Repairs. Developer agrees to repair or have repaired in a timely manner at its sole cost <br />and expense all public roads, streets, or other public or private property damaged as a result of or <br />incidental to the Work or in connection with the development of the Property, or to pay to the property <br />owner of any damaged road, street or property the full cost of such repair. In addition, Developer shall <br />obtain the written acceptance of such repair or payment from any owner whose private or public property <br />was repaired by Developer or to whom Developer has paid the full cost of such repair in accordance with <br />this Section 7. City shall be under no obligation whatsoever to accept the Work completed under this <br />Agreement until such time as all repairs have been completed or have been paid for and written <br />acceptances have been provided to the City Engineer. <br />8. Foreman or Superintendent. Developer shall give personal attention to the Work. A <br />competent foreman or superintendent, satisfactory to the City Engineer in his reasonable discretion with <br />authority to act for and on behalf of Developer, shall be named in writing by Developer prior to <br />commencement of the Work, shall be present on the Property during the performance of the Work and <br />may not be changed without advance notification to and the concurrence of the City Engineer. <br />9. Examination of Work. All of the Work shall be consistent with the Improvement Plans <br />and performed to the satisfaction of the City Engineer, in his reasonable discretion. City and its authorized <br />agents shall, at all times during the performance of the Work, have free access to the Property and the <br />Work and shall be allowed to examine the Work and all materials used and to be used in the Work. <br />10. City Costs; De posit. Developer shall pay to City the actual cost for all engineering, <br />inspection, administration, plan check, laboratory and field testing, construction, and other services <br />furnished by City in connection with this Agreement, including those performed by consultants under <br />contract with City ("City Costs"). Developer shall deposit with City the sum of One Hundred Forty -Four <br />Thousand Fifty -Four and No/100 Dollars ($144,054.00) ("Deposit") to compensate City for all City <br />Costs. Developer understands that the Deposit is an estimate and Rather agrees to pay to City the actual <br />cost of providing such services, in accordance with the City's current fees. Developer agrees to complete <br />REV: 08-29-18 PR <br />Page 4 of 24 <br />ATfY/AGR.2018.202/Kaiser MOB2 - IA <br />
The URL can be used to link to this page
Your browser does not support the video tag.