Laserfiche WebLink
6. 1. H. - Page 8 <br />Engineering Design Services for 101 Pedestrian Crossing <br />Work -Hour and Fee Estimate for the WRECO Project Team Tasks <br />Prepared for the City of Redwood City <br />Prepared by the WRECO Project Team August 9, 2018 <br />Task Task Description <br />PHASE Y <br />5 <br />CONSTRUCTION DOCUMENTS <br />5.3 <br />100% Design PS&E (Additional Effort) <br />Redesign for Waterline <br />Hours <br />Redesign Walls, footing, piles, slabs <br />2,500.00 <br />Structural Calculations <br />$ <br />Plan Revisions <br />12 <br />Update Specifications & Cost Estimate <br />6,568.00 <br />Access Gate Relocation <br />$ <br />Gate Post Foundation Design <br />26 <br />Plan Revisions <br />2,496.00 <br />Update Specifications & Cost Estimate <br />5.4 <br />Value Engineering <br />43 <br />Subtotal <br />6 <br />CONSTRUCTION SUPPORT <br />6.2 <br />Additional Construction Support due to Caltrans PEER Process <br />40 <br />Respond to Bid RFIs <br />30,862.00 <br />Respond to Construction RFIs <br />$ <br />Construction Conference Calls (4 total) <br />32 <br />Review Submittals <br />5,680.00 <br />Review Shop Drawings <br />$ <br />Review & Approve Construction Change Orders <br />16 <br />As -Built Plans <br />7,624.00 <br />Subtotal <br />$ <br />4,332-00 <br />32 <br />Phase it Subtotal <br />19,908.00 <br />OTHER DIRECT COST <br />$ <br />Travel <br />700 <br />Reproduction <br />- <br />ODC Subtotal <br />Total Amendment Cost $84,368.00 1 625 <br />84 368.Q0 <br />Page 4 of 8 <br />ATTY/AGR/2018/AMENDMENTS/AMEND NO. 4 WRECO — US 101 UC <br />REV: 08-29-18 PR <br />Project Team <br />Subtotal <br />Subtotal <br />Fee <br />Hours <br />$ <br />2,500.00 <br />20 <br />$ <br />2,496.00 <br />12 <br />$ <br />6,568.00 <br />64 <br />$ <br />3,490.00 <br />26 <br />$ <br />2,496.00 <br />12 <br />$ <br />4,972-00 <br />43 <br />$ <br />780.00 <br />6 <br />$ <br />7,560.00 <br />40 <br />$ <br />30,862.00 <br />223 <br />$ <br />4,008-00 <br />32 <br />$ <br />5,680.00 <br />42 <br />$ <br />2,452.00 <br />16 <br />$ <br />7,624.00 <br />52 <br />$ <br />4,332-00 <br />32 <br />$ <br />19,908.00 <br />156 <br />$ <br />9,052.00 <br />72 <br />$ <br />- <br />0 <br />$ <br />53,056.00 <br />402 <br />$ <br />83,928.00 <br />625 <br />$ <br />300.00 <br />$ <br />150.00 <br />$ <br />450.00 <br />Total Amendment Cost $84,368.00 1 625 <br />84 368.Q0 <br />Page 4 of 8 <br />ATTY/AGR/2018/AMENDMENTS/AMEND NO. 4 WRECO — US 101 UC <br />REV: 08-29-18 PR <br />