My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-10-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-10-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 8:12:49 AM
Creation date
10/18/2018 5:46:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/22/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Let's examine the cost to the taxpayers and <br />this does not include maintenance !! <br />SUMMARY OF BID RESULTS FOR <br />Whipple Avenue and Iris Street Enhanced Crossing Project <br />Dale of Bidding: August 22. 2018 <br />Time of Bidding, 3,00 P_M_ <br />Engineer's Estimate. $90.000-5120,000 <br />Average cost to taxpayers : "' $ 172,677.00 multiply by 5 <br />to get total cost of replacement: —$ 863,386 <br />* At the 2015 neighborhood meeting Christian Hammack stated verbally that lighted crosswalks are <br />expensive to maintain and prone to breakage. He cited the crosswalk at the main library as an <br />example. And on 7/7, 2010 at the initial meeting he stated that "Lighted crosswalk systems can be <br />very costly and we generally only install in areas of high need." <br />CONTRACTOR <br />TOTAL BID AMOUNT <br />BASE BIQ + ADD ALT BID) <br />1 <br />Guerra Construckim Group <br />5160,713.50 <br />2 <br />JJR Construction Inc. <br />S224,968.DO <br />3 <br />Goldan Bay Construclicn <br />5127,525:66 <br />4 <br />FBS VarHAU9IFd Construction, InC_ <br />$159,9$3.49 <br />5 <br />Em ire crgineering & Construction, Inc. <br />$155,000.00 <br />6 <br />sposew F=rksitneering. Inc. <br />$207,895.35 <br />Average cost to taxpayers : "' $ 172,677.00 multiply by 5 <br />to get total cost of replacement: —$ 863,386 <br />* At the 2015 neighborhood meeting Christian Hammack stated verbally that lighted crosswalks are <br />expensive to maintain and prone to breakage. He cited the crosswalk at the main library as an <br />example. And on 7/7, 2010 at the initial meeting he stated that "Lighted crosswalk systems can be <br />very costly and we generally only install in areas of high need." <br />
The URL can be used to link to this page
Your browser does not support the video tag.