Laserfiche WebLink
Let's examine the cost to the taxpayers and <br />this does not include maintenance !! <br />SUMMARY OF BID RESULTS FOR <br />Whipple Avenue and Iris Street Enhanced Crossing Project <br />Dale of Bidding: August 22. 2018 <br />Time of Bidding, 3,00 P_M_ <br />Engineer's Estimate. $90.000-5120,000 <br />Average cost to taxpayers : "' $ 172,677.00 multiply by 5 <br />to get total cost of replacement: —$ 863,386 <br />* At the 2015 neighborhood meeting Christian Hammack stated verbally that lighted crosswalks are <br />expensive to maintain and prone to breakage. He cited the crosswalk at the main library as an <br />example. And on 7/7, 2010 at the initial meeting he stated that "Lighted crosswalk systems can be <br />very costly and we generally only install in areas of high need." <br />CONTRACTOR <br />TOTAL BID AMOUNT <br />BASE BIQ + ADD ALT BID) <br />1 <br />Guerra Construckim Group <br />5160,713.50 <br />2 <br />JJR Construction Inc. <br />S224,968.DO <br />3 <br />Goldan Bay Construclicn <br />5127,525:66 <br />4 <br />FBS VarHAU9IFd Construction, InC_ <br />$159,9$3.49 <br />5 <br />Em ire crgineering & Construction, Inc. <br />$155,000.00 <br />6 <br />sposew F=rksitneering. Inc. <br />$207,895.35 <br />Average cost to taxpayers : "' $ 172,677.00 multiply by 5 <br />to get total cost of replacement: —$ 863,386 <br />* At the 2015 neighborhood meeting Christian Hammack stated verbally that lighted crosswalks are <br />expensive to maintain and prone to breakage. He cited the crosswalk at the main library as an <br />example. And on 7/7, 2010 at the initial meeting he stated that "Lighted crosswalk systems can be <br />very costly and we generally only install in areas of high need." <br />