My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-10-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-10-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 8:12:49 AM
Creation date
10/18/2018 5:46:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/22/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FACTS: <br />2010 - Several neighbors petitioned to have pedestrian crosswalks installed on Whipple Ave. <br />2011- After several meetings/emails with City staff, engineers, and residents on potential locations for visibility and safety, <br />two crosswalks were installed, one at Woodstock Place the other at King St. To date, there have been no accidents or <br />injuries at the Woodstock crosswalk. <br />2015 - Community meetings were held to discuss the utility of the crosswalks. The majority of residents were satisfied with <br />the current location at Woodstock, and the only recommendation. There was one loud dissenting neighbor; but the <br />majority appeared to rule out this individual. <br />2016 - The property owner at 1835 Whipple on one side of the crosswalk (the dissenter) pulled a permit to relocate his <br />driveway approach to accommodate his 2nd ADU on said property. The City approved the sidewalk permit, with the <br />knowledge there was an existing crosswalk ramp approach. <br />2017 - City Staff commissioned a study by a 3rd party to move the crosswalk. The surrounding neighbors were not made <br />aware of this study until October 2018. This is perplexing and a questionable use of tax payer funds on a issue that was <br />deemed to be closed. <br />2018 - Residents received a letter 10 days prior to this Public Hearing about the proposed crosswalk relocation. No <br />drawings were provided, nor was it disclosed that certain residents would lose most of their street parking. How is it that <br />the Council is set to award a contract for this project tonight without having heard the public? <br />
The URL can be used to link to this page
Your browser does not support the video tag.