<br />The design for the 24-inch pipeline in Redwood Shores Parkway between <br />Shoreline Drive and Twin Dolphin Drive (approximately 1,900 If) was included <br />in the previous Project and so is not included here. However, it will be <br />incorporated into the Bid Package 4 drawings. <br /> <br />. Two branch pipelines totaling approximately 500 If in Bid Package 4, and five <br />branch pipelines (Hinman, Pacific Shores and Beeger) totaling approximately <br />3,000 If in Bid Package 5. An additional 4,000 If of branch pipeline have been <br />included in the budget to cover a potential looped branch pipeline along Herkner in <br />Bid Package 5. The branch pipelines are all expected to be 8-inch diameter and <br />will connect to the12-inch and 24-inch pipelines. <br /> <br />. Approximately 5 service laterals in Bid Package 4 and approximately 15 laterals in <br />Bid Package 5, ranging in size from 1-inch to 8-inch diameter. The laterals will <br />extend from the new recycled water pipelines to each eligible customer site. <br />These laterals do not include schools, parks, or the library. The City intends on <br />constructing underground distribution pipelines and laterals at the same time, so <br />the roadways can be resurfaced in a manner that will provide the least public <br />inconvenience and best final appearance. This process will eliminate, to the extent <br />possible, the need to re-enter streets for pipeline construction in the future. <br /> <br />General Assumptions <br /> <br />The overall approach to this work builds upon the previous design for Bid Packages 1 to 3 <br />and subsequent scoping discussions between City staff and Consultant. The underlying <br />general assumptions used to prepare this proposal are summarized as follows. <br />Exceptions are noted in the following section of this exhibit. The work will be performed <br />on a time and materials basis - as requested - and not to exceed the compensation limit. <br /> <br />Limits of Scope <br /> <br />1. This proposal is for Bid Packages 4 and 5 pipelines only. Subsequent proposals <br />for the remaining Bid Packages will be provided upon request from the City. <br /> <br />2. The design services will be performed over an 8-month period, with bidding <br />support services extending another 2 months. <br /> <br />3. Any new easements or license agreements which are required for this Project, <br />including those from the City of San Carlos, will be obtained by Kennedy/Jenks on <br />behalf of the City. The City will pay all permit fees. <br /> <br />4. Service laterals will be designed to the customer site and will include piping into <br />new meter boxes at the property line. Determination of the lateral size and <br />location will be provided under the customer site retrofit contract work and will be <br />coordinated with this Project. No improvements on customer sites are included in <br />this Project. <br /> <br />2 <br /> <br />sllibrary/agreements/consultants/consultant_kennedyjenks_Exhibit A_BP 4 & 5 <br />