My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 Kennedy Jenks Consultant
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Kennedy Jenks Consultant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2006 3:52:43 PM
Creation date
4/13/2006 3:51:21 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy Jenks Consultants
PROJECT NAME
engineering services - Skyway & Seaport project
RMP File Number
304
Date
4/13/2006
MO Ref
06-056
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REDWOOD SHORES PROJECT DESIGN DRAWING LIST <br /> <br />BID PACKAGE 4 <br />1. Vicinity Map, Location Map and Index to Drawings <br />2. Abbreviations and General Notes <br />3. Legend and Symbols <br />4. Sheet Layout <br />5. Horizontal Alignment Tables & Table of Monuments to Replace <br />6. Redwood Shores Parkway Plan and Profile (2 sheets) <br />7. Airport Way Plan and Profile (1 sheet) <br />8. Sky Way Plan and Profile (10 sheets) <br />9. Branch Pipeline (2 sheets) <br />10. Miscellaneous Details (4 sheets) <br />BID PACKAGE 5 <br />1. Vicinity Map, Location Map and Index to Drawings <br />2. Abbreviations and General Notes <br />3. Legend and Symbols <br />4. Sheet Layout <br />5. Horizontal Alignment Tables & Table of Monuments to Replace <br />6. Seaport Boulevard Plan and Profile (10 sheets) <br />7. Branch Pipelines (14 sheets) <br />8. Miscellaneous Details (4 sheets) <br /> <br />PROJECT SCHEDULE <br /> <br />Upon City's separate notice to proceed, Consultant shall complete design work under <br />Tasks 1-4 in 9 months. This schedule assumes that preliminary design mapping is <br />provided within 14 weeks from Notice to Proceed. Bidding support services will be <br />performed over a 3-month period. The following schedule milestones are anticipated: <br /> <br />. Notice to Proceed: <br />. Survey: <br />. Preliminary Design Submittal: <br />. Receipt of Comments: <br />. 90% Design Submittal: <br />. Receipt of Comments: <br /> <br />sllibrary/agreements/consultants/consultant_kennedyjenks_Exhibit A_BP 4 & 5 <br /> <br />April 1, 2006 <br />June 15, 2006 <br />July 28, 2006 <br />August 11 2006 <br />October 20,2006 <br />November 3, 2006 <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.