Laserfiche WebLink
<br />REDWOOD SHORES PROJECT DESIGN DRAWING LIST <br /> <br />BID PACKAGE 4 <br />1. Vicinity Map, Location Map and Index to Drawings <br />2. Abbreviations and General Notes <br />3. Legend and Symbols <br />4. Sheet Layout <br />5. Horizontal Alignment Tables & Table of Monuments to Replace <br />6. Redwood Shores Parkway Plan and Profile (2 sheets) <br />7. Airport Way Plan and Profile (1 sheet) <br />8. Sky Way Plan and Profile (10 sheets) <br />9. Branch Pipeline (2 sheets) <br />10. Miscellaneous Details (4 sheets) <br />BID PACKAGE 5 <br />1. Vicinity Map, Location Map and Index to Drawings <br />2. Abbreviations and General Notes <br />3. Legend and Symbols <br />4. Sheet Layout <br />5. Horizontal Alignment Tables & Table of Monuments to Replace <br />6. Seaport Boulevard Plan and Profile (10 sheets) <br />7. Branch Pipelines (14 sheets) <br />8. Miscellaneous Details (4 sheets) <br /> <br />PROJECT SCHEDULE <br /> <br />Upon City's separate notice to proceed, Consultant shall complete design work under <br />Tasks 1-4 in 9 months. This schedule assumes that preliminary design mapping is <br />provided within 14 weeks from Notice to Proceed. Bidding support services will be <br />performed over a 3-month period. The following schedule milestones are anticipated: <br /> <br />. Notice to Proceed: <br />. Survey: <br />. Preliminary Design Submittal: <br />. Receipt of Comments: <br />. 90% Design Submittal: <br />. Receipt of Comments: <br /> <br />sllibrary/agreements/consultants/consultant_kennedyjenks_Exhibit A_BP 4 & 5 <br /> <br />April 1, 2006 <br />June 15, 2006 <br />July 28, 2006 <br />August 11 2006 <br />October 20,2006 <br />November 3, 2006 <br /> <br />10 <br />