My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Schindler Elevator Corporation
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 Schindler Elevator Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 10:18:28 AM
Creation date
11/7/2018 10:18:19 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Schindler Elevator Corporation
PROJECT NAME
Maintenance Agreement
RMP File Number
304.5
Date
11/2/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br />I. Scope of Services <br />Contractor shall provide elevator maintenance services for all elevators, incline lifts and chair <br />lifts owned by the City of Redwood City, California. There are sixteen (16) locations owned by <br />the City: twelve (12) hydraulic elevators, three (3) wheelchair lifts, and one (1) material lift in <br />the City. <br />A. Contractor Competence Requirements <br />During the term of this Agreement, Contractor shall satisfy and maintain the following criteria: <br />1. Contractor shall have a current license to perform the work in conformance with the <br />provisions of the State Business and Professions Code. <br />2. Contractor shall have the requisite skilled and experienced elevator mechanics and <br />adjusters under its direct employment and supervision. <br />3. Contractor shall certify that a member of its supervisory personnel regularly engaged in <br />inspection and supervision will visit each listed elevator at least semi-annually to observe <br />the quality of maintenance and to make certain that the quality of maintenance meets the <br />specified standards. The supervisor shall report his/her findings in writing to the City's <br />Facilities Supervisor. <br />4. Contractor shall have the necessary access to repair parts so they can be obtained within a <br />maximum of two (2) days, in order to minimize elevator downtime. <br />5. Contractor shall have a Call Center that is available 24 hours per day, 365 days per year, <br />which can dispatch technicians to the site within the specified time allowed. <br />B. Preliminary Inspections and Repairs <br />1. Contractor has, prior to submitting a bid, examined each of the listed elevators and made <br />a thorough survey of the equipment designated herein. Contractor did not include a list <br />along with Contractor's bid that states what repairs need to be done before the <br />maintenance requirements detailed in this Agreement can start. As no repairs were noted <br />along with Contractor's bid, the Contractor is responsible for all repairs under this <br />Agreement. <br />C. Preventative Maintenance Requirements <br />1. Contractor shall systematically examine, adjust, clean, and lubricate the elevators in <br />accordance with the manufacturer's specified preventative maintenance schedule. <br />2. Contractor shall assign primary and backup technician(s) to this account. An account <br />representative shall also be assigned to be the contact for communications regarding this <br />Agreement. <br />3. Contractor shall set up specific days that preventative maintenance shall occur each <br />month and notify the Facilities Supervisor of that schedule. Contractor will perform all <br />preventative maintenance during regular work days and hours, designated as Monday <br />through Friday, 7:30 a.m. to 4:30 p.m. If Contractor cannot make the scheduled <br />maintenance day because of emergencies, Contractor will notify the Facilities Supervisor <br />and the work shall be rescheduled. <br />REV: 08-07-18 MI <br />Page 6 of 13 <br />ATTY/AGR.2018.173/Schindler Elevator Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.