Laserfiche WebLink
4. If Contractor is called away during scheduled maintenance and cannot complete the <br />work, Contractor will return the next working day. <br />5. The Contractor shall: <br />a. Repair or replace: <br />I. Machine drive sheave or drum, drive sheave or drum shaft bearing, brake <br />pulley, brake coil, brake contact, lungs and component parts, drum buffers, stop <br />motion switches; and <br />II. Motor and motor generator, motor windings, rotating element, commutator, <br />brushes, brush holders and bearings; and <br />III. Controller, selector and dispatching equipment, all relays, solid state <br />components, resistors, condensers, transformers, contacts, leads, dashpots, <br />tuning devices, computer devices, steel selector tape and mechanical and <br />electrical driving equipment; and <br />IV. Governor, governor sheave and shaft assembly, bearings, contacts, and governor <br />jaws; and <br />V. Deflector, car and counterweight sheaves, bearings, car and counterweight <br />buffers, car and counterweight guide rails, top and bottom limit switches, <br />governor tension sheave assembly, compensating sheave assembly, <br />counterweight and counterweight guide shoes, including rollers or gibs, and <br />rebabbit counterweights when necessary; and <br />VI. Hoist way door interlocks, hoist way door hangers, bottom door guides and <br />auxiliary door closing devices; and <br />VII. All lamps in hoist ways, machine rooms, and elevator pits. This includes the <br />lamps in the glass hoist ways at Lot SIL. <br />b. Renew all wire ropes as often as is necessary to maintain an adequate factor of safety, <br />equalize the tension on all hoisting ropes, repair or replace conductor cables and hoist <br />ways and machine room elevator wiring, per ANSI Al 7.2 Inspectors Manual for <br />elevators and escalators. <br />c. Furnish lubricants specifically applicable to the equipment. <br />d. Re -shackle cables for drum machines, as required by CAC Title 8. <br />e. Shorten and re -shackle hoist or compensating cables if stretching of ropes makes this <br />necessary. <br />f. Check the condition and operation of safety edges on car doors and of light rays on <br />car at every visit, and if light rays are inoperative, shall repair or renew them within <br />twenty-four (24) hours. If safety edges are damaged they shall be repaired or <br />renewed. <br />6. At least quarterly, Contractor shall inspect and repair all lamps and bells for car and hall <br />buttons and arrows as well as the lamps for the location directories above the elevator <br />doors. This shall be done at all locations and a written report shall be given to the <br />Facilities Supervisor upon completion of the inspection and repair. <br />7. Contractor is responsible for controller programming or reprogramming if controller <br />program is lost or is malfunctioning for any reason. <br />8. Contractor is responsible for any and all repairs required and called out in State <br />inspections. If the Contractor does not make the repairs by the deadlines given by the <br />State, the Contractor shall pay for any late fees issued by the State. <br />REV: 08-07-18 MI <br />Page 7 of 13 <br />ATTY/AGR.2018.173/Schindler Elevator Corporafion <br />