Laserfiche WebLink
REV: 11-15-2022 JB <br />Exhibit “A” <br />SCOPE OF SERVICES AND FEE <br />Consultant shall update the Administrative Draft Environmental Impact Report (EIR) for <br />the 1125 Arguello Street Project (Project) in the City of Redwood City as requested by <br />the City to account for the Applicant’s Project design revisions associated with the <br />addition of the construction of an offsite recycled waterline. <br />Scope of Work <br />Consultant shall complete the following tasks required for preparation of the updated <br />CEQA document and technical assessments, to reflect the revised Project design (i.e., <br />offsite recycled waterline) provided by the Applicant and revised by the City on November, <br />2, 2022: <br />Technical and modeling revisions to the air quality, greenhouse gas, energy, <br />and noise analyses <br />General Project Management, coordination calls and emails from September <br />2022 through May 15, 2023 <br />Preparation of the revised Administrative Draft EIR <br />Preparation of the Screencheck Draft EIR <br />Preparation of the Public Draft EIR <br />Preparation of the Final EIR <br />Production, printing and delivery of the document <br />Noticing <br />Findings of Fact and Statement of Overriding Considerations <br />Response to public and agency comments on the Draft EIR <br />Attendance at public hearings as directed by City <br />NOTE: Amendment No.1 includes Tasks 1-7A. Amendment No. 2 begins with a new Task <br />9. The missing Task 8 was assigned to the Direct Costs under Amendment No. 1 and <br />was used for billing identification purposes to the City as Task 8. As such, this Amendment <br />No. 2 starts at New Task 9. <br />New Task 9: Technical Revisions to the Air Quality, Greenhouse Gas, Energy, and <br />Noise Analyses <br />Using the Applicant-provided and City updated Project Description dated November 2, <br />2022 and technical analysis to be provided by their consultants (Kimley-Horn, Langan <br />and Page and Turnbull), Consultant will update the previously prepared Air Quality (AQ), <br />Greenhouse Gas (GHG), Energy, and Noise analyses for the Project. <br />Air Quality and Greenhouse Gas: Updating the AQ and GHG Analysis for Arguello <br />would require the following: <br />Preparing an additional air model within CalEEMod 2020.4.0. The additional air <br />quality and GHG emissions generated from the construction of the pipeline would <br />be added to the existing emissions modeling. <br />ATTY/AGR.2022 - Amend No. 2/Stantect Consulting Services, Inc. (Page 4 of 9)