My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-11-19 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-11-19 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2019 11:05:14 AM
Creation date
11/15/2018 4:19:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.F. - Page 1 of 4 <br />/<;i-ik <br />Redwood <br />CitylCallifornia <br />wended 1967 <br />*A/ <br />DATE: November 19, 2018 <br />SUBJECT <br />STAFF REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />Final Acceptance — Sanitary Sewer Pump Station Improvements Project - P.S. No. 13 and P.S. No. 16 <br />RECOMMENDATION <br />Accept, by motion, the Sanitary Sewer Pump Station Improvements Project - P.S. No. 13 and P.S. No. 16, <br />authorize the release of bonds and retention according to City procedures. <br />STRATEGIC INITIATIVE <br />Public Safety <br />BACKGROUND <br />On May 22, 2017, the City Council awarded the construction contract for the Sanitary Sewer Pump <br />Station (P.S.) Improvements Project - P.S. No. 13 and P.S. No. 16 to Casey Construction, Inc. of Emerald <br />Hills, CA for a price of $1,404,140. The project scope included rehabilitation of the two existing sanitary <br />sewer pump stations in Redwood Shores. P.S. No. 13 is located near the corner of Redwood Shores <br />Parkway and Shoreline Drive and P.S. No. 16 is located near the corner of Shannon Lane and David Lane. <br />Specific project components for each pump station, included: <br />• Removal and replacement of existing mechanical and electrical structures <br />• Rehabilitation and repair of an existing wet well <br />• Furnishing, installation of a temporary by-pass system <br />• Replacement of submersible pumps and motor control center <br />• Installation of a complete standby generator <br />• Connection of pump station to existing force mains <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcitV.org <br />86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.