My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 BFK Engineers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 BFK Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2018 4:26:48 PM
Creation date
11/16/2018 4:26:36 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BFK Engineers, Inc.
PROJECT NAME
Oakwood Drainage Management
RMP File Number
304.5
Date
11/8/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br />SCOPE OF SERVICES <br />Itemized List of what Consultant will do for City and at what price and schedule. <br />SURVEY AND DRAINAGE PLANS FOR THE OAKWOOD DRIVE LOCALIZED <br />DRAINAGE MANAGEMENT PROJECT <br />BKF Engineers ("CONSULTANT") shall provide survey and drainage plan services to <br />the City of Redwood City ("CITY"). <br />TASK 0 — PROJECT MANAGEMENT AND COORDINATION <br />This task includes project monitoring and administration, attendance in project <br />meetings, project coordination, defining and tracking tasks, preparation of progress <br />schedules, invoices, coordinating with sub -consultants and overseeing their work <br />progress and conducting internal quality assurance/quality control (QA/QC) activities. <br />CONSULTANT will maintain frequent and timely communication with CITY throughout <br />the duration of the project. CONSULTANT will attend one onsite meeting with CITY. <br />CONSULTANT will prepare a meeting agenda and provide minutes of each meeting. <br />Two hours is assumed for each meeting. Attending meetings in addition to those listed <br />below and under each Task will be charged as an additional service on a time -and - <br />materials basis. <br />Deliverables: Meeting Minutes (Word and PDF format) <br />TASK 1 — DRAINAGE EVALUATION <br />As part of other development projects in the project vicinity, CONSULTANT has <br />gathered information that is ready available to us to conduct a preliminary drainage <br />evaluation. CONSULTANT will use this information to utilize time efficiently in the field <br />by focusing on unknowns. <br />1.1 Drainage Delineation: Prior to conducting site investigation and survey, <br />CONSULTANT will use the existing information including the 2017 County <br />LiDAR contour data and the GIS street and parcel data to delineate <br />tributary area. CONSULTANT will prepare drainage map that shows the <br />total tributary area to both sides of the intersection, sub -drainage <br />boundaries, flow paths, sags and low points. CONSULTANT will use aerial <br />imagery, LiDAR contour and GIS streets and parcels as map background <br />layers. <br />1.2 Drainage Calculations: CONSULTANT will conduct hydrologic and <br />hydraulic analyses to determine the flow and volume. We will use Rational <br />REV: 10-12-18 PR <br />Page 10 of 14 <br />ATTY/AGR.2018.246/BKF Engineers - Oakwood Drainage Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.