REV: 10-25-2021 RL <br />EXHIBIT A <br />1.Scope of Work <br />Contractor shall repair and maintain the City's storm water pumps, motors and related <br />apparatuses. Contractor will furnish all parts, materials, labor, equipment, tools, and fuel <br />necessary to complete the work. Contractor is also responsible for disposal of any unusable <br />material and debris as a result of the work. <br />Task 1: Preventative Maintenance (PM) <br />A.Contractor will perform PM inspections for storm water pumps and motors. At a <br />minimum, PM will include: <br />•Checking electrical condition of insulation on power cable and on all phases of motor; <br />•Checking for any loose or faulty electrical connections within the pump control panel; <br />•Checking resistance between stator windings; <br />•Checking voltage supply between all phases of the electrical control panel; <br />•Checking voltage balance between all phases on the load side of the pump control with <br />pump on; <br />•Checking amperage draws on all phases of the pump motor; <br />•Checking condition and operation of motor thermal protectors control system (if so <br />equipped); <br />•Removing pumps and motors from pump station for physical inspection; <br />•Checking condition of upper shaft seals (inspect condition of motor housing); <br />•Checking condition and operation of leakage detector (if so equipped); <br />•Checking lower shaft seals (inspect condition of oil); <br />•Changing oil if needed (cost of oil included); <br />•Checking for worn or loose impeller; <br />•Checking all impeller wear rings; <br />•Checking for noise in upper and lower bearings; <br />•Checking physically for damage of pump and power cable; <br />•Cleaning, resetting, and checking operation of level sensors; <br />•Checking for correct shaft rotation; <br />•Reinstalling pump and motors, and checking for leakage at the discharge connection; <br />•Testing pump operation cycle; <br />•Checking operating of valves and pipes in station; and <br />•Any work not specifically mentioned, but which is needed to make the maintenance <br />complete within the intent of this specification shall be performed without additional cost. <br />B.Contractor shall replace parts with the same make and model as the original <br />component, unless Contractor obtains written authorization from City staff. <br />C.Contractor will provide a written report of all findings, results, and work performed for <br />each pump station upon completion of PM. <br />D.Contractor will complete PM inspections for all assigned storm water pumps and <br />motors before May of each year. <br />E.Contractor will contact City staff to arrange for pump station site access to perform <br />PM inspections. Contactor will perform all PM inspections during the workweek <br />(Monday- Friday), between 7:00 a.m. and 4:00 p.m. If Contractor is called away and <br />cannot complete the scheduled PM, Contractor will return the next working day. <br />F.Contractor will notify City staff immediately upon discovering any emergency or <br />immediate repairs needed to a pump during the course of PM inspections. <br />Task 2: Major Repairs <br />A. Contractor will obtain written approval from City staff before starting any major <br />repairs. <br />B. Contractor will submit to City staff the following information in order to obtain written <br />ATTY/AGR.2021 - Amend No. 2/Commerical Pump and Mechanical, Inc. (Page 4 of 6)