Laserfiche WebLink
Construct Concrete Driveway - Commercial <br />Square Foot <br />$18.00 <br />Remove Concrete Curb and Gutter <br />Linear Foot <br />$6.00 <br />Construct Concrete Curb and Gutter Including 12" Asphalt <br />Strip in Street <br />Linear Foot <br />$90.00 <br />Remove and Replace Additional Asphalt Pavement as <br />Directed <br />Square Foot <br />$16.00 <br />Remove Pavers, Asphalt and Other Designated Walkway <br />Material <br />Square Foot <br />$9.00 <br />Construct Wheelchair Ramp per Caltrans Standard Detail <br />Each <br />$4950 <br />Repair Irrigation System <br />Linear Foot <br />$20.00 <br />Additional Sub -Base Excavation <br />Cubic Yard <br />$65.00 <br />Existing Drain Line Replacement <br />Each <br />$275.00 <br />REV: 10-30-18 PT <br />Page 7 of 7 <br />ATTY/AGR.2018.255/Spencon Construction/Sidewalk Repair <br />